Key takeaways

Successful project management depends on a team-wide understanding of roles and responsibilities. Using a RACI matrix to assign and define each role is a great way to keep a project on track and positioned for success.

Featured Partners

{{ POSITION }}. {{ TITLE }}

{{ TITLE }}

How Does a RACI Chart Help Project Managers?

Project managers use RACI charts to keep track of team roles and relay those responsibilities to the larger team. The matrix defines clear roles and responsibilities for individual team members across the various phases of the project, breaking the roles down into four types. Each letter of the project management acronym stands for a designation: those who are Responsible and Accountable for project deliverables, those who should be Consulted as work begins, and stakeholders who need to be Informed of ongoing progress, roadblocks, and updates. 

Read more: Project Management Phases

RACI Matrix Definitions 

Responsible.

The individual(s) with responsibility for the task or deliverable is typically responsible for developing and completing the project deliverables themselves. The responsible parties are typically hands-on team members who make direct contributions toward the completion of the project. The responsible team is comprised of the project’s “doers”, working hands-on to ensure that each deliverable is completed. 

Some examples of responsible parties are:

  • Project Managers
  • Business Analysts
  • Graphic Designers
  • Copywriters

Accountable

Accountable parties ensure accountability to project deadlines, and ultimately, accountability to project completion. This group frequently also falls under the informed category.

Some examples of accountable parties are:

  • Product Owners
  • Signature Authorities
  • Business Owners
  • Key Stakeholders

Consulted individuals’ opinions are crucial, and their feedback needs to be considered at every step of the game. These individuals provide guidance that is often a prerequisite to other project tasks, for example, providing legal guidance on a project throughout the process. If you are working on new product development or expansion, this could essentially be the entire organization.

Some examples of consulted parties are:

  • Legal Experts
  • Information Security and Cybersecurity Experts
  • Compliance Consultants

Informed persons are those that need to stay in the loop of communication throughout the project. These individuals do not have to be consulted or be a part of the decision-making, but they should be made aware of all project updates. Typically, this party are business owners or stakeholders that are more interested in viewing the project at a 30,000-foot view.  Keep this group on your cc list for awareness of topics, decisions, and progress – that includes making them part of the initial project kickoff and project demos as optional attendees. This group often also falls under the accountable group.

Some examples of informed parties are:

  • Project Committee Members
  • External Stakeholders

Read more: DACI vs RACI Model Guide

Why Are RACI Roles Important?

The same way a requirements traceability matrix provides accountability to project requirements by mapping out the relationship between these requirements and the project work, RACI roles provide a sense of organization and clarity for teams that are looking to divide roles and keep team members accountable for their contributions. Considering that 27% of projects go over budget, for reasons like scope creep and lack of defined roles, RACI roles help position a project for success and avoid common pitfalls. 

Moreover, RACI roles help ensure that communication between all roles is ongoing. When you consider that nearly half of all project spending is at risk of being wasted due to a lack of effective team-based communication, it becomes all that more important to prioritize. Ultimately, teams who prioritize communication and well-defined roles are better off, and RACI roles help teams achieve that goal faster – while providing accountability for each team member’s unique contributions to the success of the project. 

Read More: Top 10 Main Causes of Project Failure

How to Create a RACI Matrix 

If you’re looking to implement a RACI matrix as part of your team’s project planning process, take these steps to create a RACI matrix.

Ensure that you have a thorough understanding of the project and its demands before outlining any further steps by communicating with key stakeholders and decision-makers.

Determine the list of key activities and deliverables from the director of program management or other leadership. 

Determine who is needed to be a part of the project or initiative.

Determine the project roles and responsible job titles and persons for each activity and deliverable.

Hold review sessions with key members of the team for alignment, and if you haven’t already, host a kickoff meeting with the entirety of the team and key stakeholders to unveil the matrix, address questions, and more. 

If the project has already started, it’s not too late to implement a RACI matrix.

  • Outline the story. Using research from multiple sources, do a, b, c, and d.
  • Utilize steps 2 and 3 (shown above). Ensure the right groups are assigned and engaged. 
  • Hold a review session. Ensure that the team acknowledges and discusses the plan and the roles assigned.

Read more: 8 Factors That Lead to Successful Projec ts

Examples of a RACI Matrix

RACI matrix example.

As shown above, a RACI matrix helps break down what roles individuals will play as work is carried out and to what extent they will be involved in the project overall. The horizontal axis represents each person on the project team and the vertical axis represents each task.

Each square of the matrix represents an individual, a task, and that individual’s role within the project, either responsible, accountable, consulted, or informed. In this situation, for example, the project manager is accountable for accessing risk, defining performance requirements, creating designs, executing construction, and approving construction work. However, they are only informed about approving construction work and defining functional and aesthetic needs.

Read more: Understanding Different Types of Stakeholders and Their Roles

Our FREE Downloadable RACI Matrix Template

Who creates the raci matrix.

The RACI matrix — sometimes called RACI model, RACI diagram, or simply just RAC — is created by the project manager at the start of the project as a key part of establishing the initial human resources planning for the project. Because miscommunication is a common threat to any project, RACI charts are a great asset to teams dealing with any type of project, from very simple projects to extremely complex ones. 

Common Mistakes When Creating a RACI Matrix

  • Failure to plan ahead: Utilizing a RACI matrix should not be your first step in project planning. Having a fully assembled project team and at least a general idea of a task list and project plans is a better place to start before preparing a matrix.
  • Working with too large a team: A RACI matrix is likely not the best bet for a large team, as it will make the matrix hard to understand and overly complex.
  • Not communicating with the project team: A RACI matrix should help organize tasks and responsibilities that have already been introduced to the project team – no one likes to be blindsided. Be sure to host a kickoff meeting with the team first before creating a RACI matrix.

Frequently Asked Questions

Implementing a RACI matrix takes more than just a few emails and sporadic conversations – it takes consistent communication and planning. You should host a kickoff meeting to introduce the matrix to the team and make a plan to continue meeting at predetermined times throughout the project lifecycle. 

Here are a few more tips to keep in mind as you implement your RACI matrix within the team dynamic:

  • Get everyone prepared. Send the document around to the meeting distribution as read-ahead material, requesting feedback if there are any major concerns. 
  • Roll out each role for the team . During the meeting, conduct a review of the tasks and responsible parties. Do not rush through this review, but rather ensure enough time in your project kickoff for this important aspect. (Be certain to clarify the definitions of RACI to avoid ambiguity.)
  • Consider changes and update accordingly. After the meeting, send out the notes documenting acceptance or updates to the RACI. In addition to sending out the notes, request any corrections within a reasonable yet defined timeframe. Clarify that if no changes are requested, each person is acknowledging their role and committing to the project tasks as outlined.
  • Stay in touch. Consider a quick review with the entire team each quarter or every six months for longer projects to ensure it remains up-to-date and not simply another document in the repository but a relied-upon artifact.

As you implement the RACI matrix…

  • Encourage teamwork and foster collaboration whenever possible.
  • Don’t fear updates – make changes and adjustments as needed (but be sure to communicate those changes clearly to all parties).
  • Earlier is better. Roll out your matrix plan to the team BEFORE you plan to implement it for the best results. 
  • Have a clear-cut understanding of the project scope and how each role connects to the overall project goal.

For “Responsible” Parties:

  • Make sure your project’s definition of Responsible is clear on who holds the “decider” role for the project or project phase’s completion, and what the dimensions of that responsibility will be.
  • Ensure that all parties are aware of their role and responsibilities within the matrix.

For “Accountable” Parties: 

  • When multiple Accountable team members must exist, use your definitions to make clear which individual is accountable for a given project element, and how that individual needs to interact with other Accountable team members.
  • Ensure that there is only one “Accountable” party assigned per task.
  • Be sure that the Accountable party has the authority and power to oversee the task as the accountable party.

For Consulted and Informed Parties: 

  • Consulted parties are often high-level decision-makers with heavy schedules. Make sure you’re clear on their availability ahead of time.
  • Similar to Consulted parties, Informed parties are often less hands-on and have less understanding of day-to-day project operations. As the project goes on, make sure to keep detailed notes to keep the Informed party up-to-date on key information. 
  • Understand the ways that these parties like to communicate and create a plan to reach them early – whether that’s over phone calls, emails, video calls, or from within your project management system’s collaboration tools.
  • Knowing the difference between who needs to be consulted versus informed can be a challenge if there is ambiguity about project roles. Consider what aspects of the project different team members need to know to do their jobs, and then bake those into your definitions.

RACI Matrix Pros & Cons

  • Increased Engagement: RACI helps engage project participants in the project lifecycle. 
  • Enhanced Project Planning: Project managers make project planning more organized, efficient, and detailed.
  • Identifiable Improvement Opportunities: Areas of improvement are more easily identified.
  • Easier Collaboration: Use of a RACI matrix creates a clear path for leadership to sign off on project steps, as project documentation in the RACI model is heavily emphasized.
  • Better Communication: Improves overall group communication as a whole.
  • Group Accountability: Assists groups, especially larger project teams, stay connected and accountable to their roles and project goals
  • Limitations on Role Scope: The RACI model does not provide details on role scope, especially for responsible parties. These gaps in detail also affect other team roles, for example, another gap in a RACI is the determination of who is responsible for verifier and signatory.
  • Limits on Task Details and Scope: While a RACI matrix can provide an overview of who is responsible for different tasks, it will not state what needs to be done.
  • Not Aligned to the Agile Methodology: Project managers using an agile methodology like scrum may find it redundant since accountability, ownership, and ongoing communication is built into the scrum framework (i.e., product owner, scrum master, and daily standups with the team). Additionally, agile focuses on team-based delivery and accountability, while the RACI framework and alternatives focus on individual responsibility and autonomous accountability.

Read more: Top 10 Causes of Project Failure

Free RACI Matrix Templates

A number of project management software solutions include a native RACI matrix template. Here are just a few we’ve found:

Colorful RACI Chart Template

We love this template from Smartsheet because it’s colorful, thorough, and includes room for every party involved in the project. 

RACI template from smartsheet.com.

Pastel Colored RACI Matrix Template

This template from the Academy to Innovate HR is a great choice for project managers who want to organize their team roles with an easy-on-the-eyes chart that evolves beyond the simple spreadsheet. 

RACI matrix template from the Academy to Innovate HR.

Simple RACI Chart from Clickup

These RACI templates from Clickup have enough variety to fit any of your project needs, but are simple enough for even beginner PMs to use.

A simple RACI matrix from clickup.com.

Detailed RACI Matrix Template

This template is a great starter template for anyone looking to explore RACI charts in their project management strategy . As an added bonus – it comes with the RACI definitions already built in!

A detailed RACI matrix template from Vertex42.

Excel-Based RACI Chart Template

Are you an Excel or Google Sheets user looking to take advantage of the RACI matrix? An Excel-formatted template from Project Management Docs can be just the solution for you. This template is a great template for users who want a chart that comes in a pre-formatted structure.

An Excel spreadsheet-based RACI matrix from projectmanagementdocs.com

Join our newsletter

Subscribe to Project Management Insider for best practices, reviews and resources.

By clicking the button you agree of the privacy policy

{{ TITLE }}

You should also read.

5 Ethical Issues in Project Management & How to Handle Them

5 Ethical Issues in Project Management & How to Handle Them

Senior Project Manager Job Description and Responsibilities

Senior Project Manager Job Description and Responsibilities

Vertical vs Horizontal Project Management

Vertical vs Horizontal Project Management

Lauren Good Avatar

Get the Newsletter

You might also like.

How to Delegate for Project Management: Step-by-Step Guide

How to Delegate for Project Management: Step-by-Step Guide

Matt Klein Avatar

Creating Project Timelines: Step-by-Step Guide for 2024

Hannah Donato Avatar

7 Best Project Management Software for Small Businesses

Anne M. Carroll Avatar

You might be using an unsupported or outdated browser. To get the best possible experience please use the latest version of Chrome, Firefox, Safari, or Microsoft Edge to view this website.

What Is A RACI Chart? How This Project Management Tool Can Boost Your Productivity

Dana Miranda

Updated: Jun 4, 2024, 2:46pm

What Is A RACI Chart? How This Project Management Tool Can Boost Your Productivity

The RACI chart has long been a popular tool amongst project managers around the world. Also referred to as the RACI matrix, it’s used to clarify employee roles and responsibilities for each task, milestone and decision that takes place throughout a project.

The chart is designed to ensure clear communication and smooth workflows across all parts of a team. RACI charts can help prevent that sinking feeling when a major decision-maker comes at the end of a project and complicates things with a large number of changes because they weren’t consulted throughout the project.

Featured Partners

From $8 monthly per user

Zoom, LinkedIn, Adobe, Salesforce and more

monday.com

On monday.com's Website

Yes, for one user and two editors

$9 per user per month

Google Drive, Slack, Tableau, Miro, Zapier and more

Smartsheet

On Smartsheet's Website

Yes, for unlimited members

$7 per month

Slack, Microsoft Outlook, HubSpot, Salesforce, Timely, Google Drive and more

ClickUp

On ClickUp's Website

$9.80 per user per month

Salesforce, Adobe, Miro, Netsuite, Quickbooks, SAP

Wrike

On Wrike's Website

What Is a RACI Chart?

A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it’s a simple spreadsheet or table that lists all stakeholders on a project and their level involvement in each task, denoted with the letters R, A, C or I. Once these roles are defined, assignments can be attributed to the roles and work can begin.

R, A, C, I stands for:

Responsible

Accountable.

Here’s what each designation means:

Responsible designates the task as assigned directly to this person (or group of people). The responsible person is the one who does the work to complete the task or create the deliverable. Every task should have at least one responsible person and could have several.

Responsible parties are typically on the project team and are usually developers or other creators.

The accountable person in the RACI equation delegates and reviews the work involved in a project. Their job is to make sure the responsible person or team knows the expectations of the project and completes work on time. Every task should have only one accountable person and no more.

Accountable parties are typically on the project team, usually in a leadership or management role.

Consulted people provide input and feedback on the work being done in a project. They have a stake in the outcomes of a project because it could affect their current or future work.

Project managers and teams should consult these stakeholders ahead of starting a task to get input on their needs, and again throughout the work and at the completion of a task to get feedback on the outcome.

Not every task or milestone needs a consulted party, but the project manager should consider all possible stakeholders when creating the RACI chart and include as many consulted parties as is appropriate. You should limit this to only necessary input, however. For example, one consulted party per affected team is generally considered best practice to avoid clogging the process with too much input.

Consulted parties may be individuals on the project team who aren’t working on a given task but whose work will be affected by the outcome. They’re also often teammates outside of the project team—even in different departments—whose work will be affected by the outcomes of the project.

Informed folks need to be looped into the progress of a project but not consulted or overwhelmed with the details of every task. They need to know what’s going on because it could affect their work, but they’re not decision makers in the process.

Informed parties are usually outside of the project team and often in different departments. They might include heads or directors of affected teams and senior leadership in a company.

When Should You Use a RACI Matrix?

The framework of a RACI chart is useful for almost any project, although some teams might find it more useful than others

For example, I know in creating this article that I’m the responsible party, because I’m doing the work of writing. My editor is accountable for assigning and reviewing the work. And they likely have consulted and informed others around them, such as a managing editor and an SEO specialist.

But this project is fairly simple. It only takes a few steps and includes a handful of stakeholders. A formal RACI chart comes in handy for complex and long-lasting projects that include lots of stakeholders, tasks and milestones, especially if work is overlapping.

For example, a company’s website redesign would require design, copy and development teams to work on tasks concurrently. Each task would affect work in sales, marketing, finance and business development. Structural changes, timelines and major costs would require input and approval from senior management.

Needs are easily overlooked and requirements dropped in such complex projects.

A project manager typically creates a RACI chart to avoid missing those important details and ensure clear communication throughout the project.

Using RACI with Other Project Management Methodologies

Agile is a very popular type of project management, especially for tech workers. While RACI is applicable to agile project management, schools of thought vary on whether it is necessary for an agile context.

Additionally, the Scrum and Scrumban project management methodologies build project ownership (accountability) into their framework and are designed to facilitate regular communication among project teams and outside stakeholders. That makes a RACI chart seem redundant for this method and possibly a poor use of a project manager’s time.

However, additional communication and clarification—in a systematic fashion—tend to be more of a benefit than a drawback for any project, so some SCRUM project managers find RACI useful for clarifying roles for individual projects or their overall process.

Example RACI Chart (and How To Use It)

types of assignment matrix

To create a RACI chart, list all of a project’s tasks down the left-hand column and stakeholders across the top row. For each task, enter an R, A, C or I to assign a level of involvement for each stakeholder in each task.

For example, in the matrix above:

  • The senior analyst is responsible for completing the work in the econometric model.
  • The SVP finance is accountable for that task—they assign it to the senior analyst and review the work.
  • The team will consult the SEO lead for input before and feedback after the task.
  • The team will inform the project manager, head of design, sales director and senior management of the project’s progress.

Color coding tasks can be useful to see at a glance whether any team member is responsible for too many tasks within a project and to make sure you’ve assigned at least one Responsible and one Accountable party for each task.

Breaking the chart down by project phases also lets you see how many tasks anyone is responsible for within a certain timeframe, which can help distribute work evenly and avoid overwhelm.

Pros and Cons of RACI

From a project management perspective, things like more organization and clearer communication are generally better, so the benefits of using a RACI chart on a project far outweigh the drawbacks in most cases. With that in mind, teams should be cognizant of the initial time investment of creating a RACI chart and the rigidity of the roles.

  • Maintain clear and open communication with all stakeholders.
  • Avoid overwhelming team members with tasks or unnecessary information.
  • Avoid “too many cooks” offering input on any task.
  • Help stakeholders prepare for a project’s future impact on their work.
  • You might spend time unnecessarily creating the chart for simple projects.
  • Roles are rigid and might not fully illustrate a team member’s stake in a project.

You might see additional drawbacks using a RACI chart for your project if your team succumbs to some common pitfalls, including:

  • Stakeholders will be confused if they don’t understand the differences among the terms, especially Responsible versus Accountable and Consulted versus Informed.
  • It’s a formality and a waste of time if no one references it after approval.

RACI Matrix Alternatives

Some teams find the roles designated through the RACI model aren’t the right fit for their projects. You might find better options in these less common alternatives—all use a chart with tasks and stakeholders like RACI, but they use different terms in an attempt to more clearly define roles.

This alternative to RACI uses the RACI model plus S for Supportive. This is someone who participates in doing the work of a task by supporting the responsible parties.

This model designates stakeholders as:

  • Communicate: These are the consulted and informed parties.
  • Approve: This is the decision maker.
  • Responsible: This person does the work.
  • Support: These parties support the responsible person in doing the work.

This model simplifies CARS with just the Responsible, Approve and Support roles. It eliminates communication outside the project team, which would need to be accounted for another way in the project management method.

This model includes these roles similar to RACI:

  • Drivers: The people who do the work.
  • Approvers: The decision makers.
  • Contributor: People who are consulted on the task.
  • Informed: People who are informed of the project’s progress.

In this model, stakeholders are assigned these actions:

  • Contribute: People who are consulted and who do the work.
  • Lead: People who delegate work and manage a task.
  • Approve: Decision makers.
  • Monitor: People who are kept in the loop on a project’s progress.

Bottom Line

Projects can be complex, confusing and chaotic. That’s why we rely on team members with the project management skills necessary to reign in the disparate pieces of a project and focus directly on keeping them organized as a project progresses.

A RACI chart is one tool that helps project managers keep a project on track.

By listing all stakeholders and assigning a level of involvement for each task, the chart helps teams communicate clearly and keep the right people in the loop.

  • Best Project Management Software
  • Best Construction Project Management Software
  • Best Project Portfolio Management Software
  • Best Gantt Chart Software
  • Best Task Management Software
  • Best Free Project Management Software
  • Best Enterprise Project Management Software
  • Best Kanban Software
  • Best Scrum Software
  • Asana Review
  • Trello Review
  • monday.com Review
  • Smartsheet Review
  • Wrike Review
  • Todoist Review
  • Basecamp Review
  • Confluence Review
  • Airtable Review
  • ClickUp Review
  • Monday vs. Asana
  • Clickup vs. Asana
  • Asana vs. Trello
  • Asana vs. Jira
  • Trello vs. Jira
  • Monday vs. Trello
  • Clickup vs. Trello
  • Asana vs. Wrike
  • What Is Project Management
  • Project Management Methodologies
  • 10 Essential Project Management Skills
  • SMART Goals: Ultimate Guide
  • What is a Gantt Chart?
  • What is a Kanban Board?
  • What is Gap Analysis?
  • Work Breakdown Structure Guide
  • Agile vs. Waterfall Methodology
  • What is a Stakeholder Analysis
  • What Is An OKR?

What Is SNMP? Simple Network Management Protocol Explained

What Is SNMP? Simple Network Management Protocol Explained

AJ Dellinger

What Is A Single-Member LLC? Definition, Pros And Cons

Evan Tarver

What Is Penetration Testing? Definition & Best Practices

Juliana Kenny

What Is Network Access Control (NAC)?

Leeron Hoory

What Is Network Segmentation?

How To Start A Business In Louisiana (2024 Guide)

How To Start A Business In Louisiana (2024 Guide)

Jacqueline Nguyen, Esq.

Dana Miranda is a Certified Educator in Personal Finance® who's been writing about money management and small business operations for more than a decade. She writes the newsletter Healthy Rich about how capitalism impacts the ways we think, teach and talk about money. She's the author of YOU DON'T NEED A BUDGET (Little, Brown Spark, 2024).

With over a decade of editorial experience, Rob Watts breaks down complex topics for small businesses that want to grow and succeed. His work has been featured in outlets such as Keypoint Intelligence, FitSmallBusiness and PCMag.

A Comprehensive Project Management Guide for Everything RACI

By Kate Eby | July 15, 2016 (updated September 5, 2023)

  • Share on Facebook
  • Share on LinkedIn

Link copied

To ensure collaboration and project success, it is crucial for all project stakeholders to understand their roles and responsibilities and those of other project members. This is especially important when project teams are more complex due to their large size, involvement of distributed team members, or reliance on staff from multiple departments. 

RACI stands for Responsible Accountable Consulted Informed. While its origins are murky, the RACI matrix has been adopted by many organizations to associate roles with project deliverables. One Six Sigma tutorial describes RACI this way:

“Typically a task is associated with at least one role or in some cases multiple roles. This ‘Association’ of the role with a task can be divided into the following four association types:

  • R esponsible
  • A ccountable

The above four types of association of a role to a task represented in a simple task vs. role diagram or matrix is called RACI (pronounced ‘racey’) matrix. So basically the RACI matrix is a responsibility assignment matrix (RAM), designed to assign tasks, activities, responsibilities, accountability, decision making, support to team members of a process/project, and clarify expectations on the level of their participation.” Here is an example of a RACI matrix:

types of assignment matrix

This guide will explain when to use RACI, why it works, guidelines to use it effectively, and the role it can play in effective project management in all industries from construction to healthcare. Lastly, we'll show you that once you've created your own matrix, you'll need a collaborative, real-time tool, like Smartsheet, to manage the rest of the project details — from start to finish.

The Four Association Types

RACI has four association types: responsible, accountable, consulted, and informed. Responsible roles produce deliverables; accountable roles check the deliverables; consulted roles advise on tasks; and informed roles are kept informed throughout these processes.

  • Responsible: These roles are responsible for completing the task or deliverable. For example, if the responsibility role is a technical writer, this person may be responsible for writing online help files. A software developer wouldn’t write the help files, but might incorporate those files into the product, which would be defined as a different task.
  • Accountable: This type of role has the final authority on (or is accountable for) the task’s completion. To take the previous example of a technical writer developing online help and a software developer incorporating the help files, a product manager might be responsible for ensuring that the files make it into the product.
  • Consulted: This role functions as an adviser to a task. For example, a team may consult with a Scrum Master as a subject matter expert (SME). Consider advisers carefully, as having too many people in this role can stretch the task time and raise the risk of poor performance.
  • Informed: Informed team members are kept up to date on task completion. Charting this role helps to illustrate dependencies among tasks and also ensures transparency into task status. It can be difficult to identify those who need to be informed, so consult various roles to determine who needs status updates. For example, the sales manager may require status updates because a customer has a special interest in feature development.

When to Use RACI

A RACI model is a useful tool for general project management. Use a RACI matrix when processes are stalled due to role confusion, or when role authority is not clearly outlined. We’ve outlined some common use cases for RACI below:  

  • If the approval process is bogged down, it may be due to role confusion.
  • If decisions are being overruled often and seemingly arbitrarily, this is also a situation that can benefit from clarifying roles.
  • Another situation that frequently occurs is that many people perform the same analysis tasks. When tasks are not getting done, it may be that nobody knows who should be doing them.
  • When the authority to perform tasks is not understood, it may be time to define roles and tasks, responsibilities, and authority.

Eliminating this sort of confusion and clarifying roles and tasks is the chief function of a RACI Matrix.

RACI is among the most popular models, but there are several alternatives, including:

  • PACSI – Used in situations where multiple stakeholders can review and veto the work of a single accountable person. The roles include Performed, Accountable, Control, Suggested, and Informed.
  • RAPID – Created by Bain & Company to clarify decision accountability through clear role and responsibility delineation. The roles include Recommend, Agree, Perform, Input, and Decide.

The Value of RACI

Implementing a RACI model helps you to involve the most qualified people in your projects. Project managers can use RACI to quickly develop charts that provide clarity to the team. Some major benefits of the RACI model are as follows:

  • Eliminating role confusion.
  • Preventing over-allocation of resources to one project and under-allocation to another.
  • Clearly defining roles to all the people who fill them (clear understanding of expectations is key to a smooth project and reduces the need for conflict resolution later).
  • Ensuring no task is overlooked when resources are allocated.
  • Providing a fast and efficient way to re-allocate resources when there is turnover. New people can quickly identify their roles in a project and the roles of those with whom they must interact.

Finally, because the Informed category is given equal weight, the RACI Matrix encourages communication between roles. Communication is the key to clearly understanding expectations, which results in a smooth project.

RACI Matrices

A RACI matrix is a collection of all project activities associated with the people or roles responsible for each. Your matrix should include all project elements, including planning, testing, design, and support.

To create a RACI matrix, consider the following steps: 

  • Decide How to Chart the Matrix: You can use any number of tools or templates, including a spreadsheet, whiteboard, or software solution.
  • Identify the Project Tasks or Deliverables: Meet with key stakeholders to develop a list of project tasks. For this discussion, tasks include necessary activities, like meetings or events, as well as tangible deliverables, like features or products. Plot tasks across the X or Y axis of the matrix. For example, if you are charting a software project developed under Agile, the sprint demo meeting may be a required activity and should be included in the matrix as a task. Don’t forget to add maintenance of the RACI Matrix as its own task. The project manager usually maintains the RACI Matrix.
  • Identify the Project Roles: Project roles are labeled across the other axis of the matrix. The project roles make the matrix more understandable and can be useful for adding any data you may have forgotten. As you identify roles, add any tasks that apply to those roles on the task axis. The task axis is also useful for identifying roles and clarifying resource allocation. This is a good time to assign names to roles as well — one name per role is optimal.
  • Label the Intersections of the Axes: Where the X and Y axes intersect, label the intersection with an R, A, C , or I to finalize the matrix with who should be responsible, accountable, consulted, or informed on each task.

RACI Guidelines

While RACI matrices will differ by project, there are some broad guidelines that you should always follow. Above all, your matrix should encourage teamwork and inform all people of their roles and assignments. We’ve laid out additional best practices below: 

  • Avoid multiple levels of oversight – one level is enough 
  • Encourage teamwork
  • Maintain chart fluidity – make changes as needed and let people know when things change
  • Assign only one Accountable per task
  • Ensure Accountable assignees have authority to ensure the task is complete
  • Avoid too many consultants as they can take up too much time (waiting for answers, gathering input, etc.) while too few can damage performance, so try to find the "sweet spot”  
  • Inform everyone with a role of their assignment

Finding the Right RACI Template

RACI templates save time and provide a starting point for building your chart. Choose a simple, customizable template to ensure that it is as useful as possible for all team and project types.

Some templates use the X axis for the tasks and Y for roles, and others do the opposite. If tasks exceed roles, as they generally do, it is easier to use the X axis for tasks and the Y for roles as you will be able to see the greatest number of roles per task at a glance on most computer monitors. On the other hand, you may find it easier to filter a chart based on role (for instance, filtering to show only the “I” roles for a given task) with the tasks on the X axis. In addition, most templates use some form of color-coding.

Regardless of which template you select, using one will eliminate a lot of basic work in constructing the chart and will free your time to define roles and tasks.

RACI Project Management

RACI project management focuses on creating and managing a RACI matrix to identify and resolve conflicts in roles and revise role categorization. You should approach analysis as a team and encourage all roles to provide feedback.

A RACI Matrix is analyzed vertically and horizontally. Here are some things to look for when reviewing the role axis (whether this is horizontal or vertical):

  • If one role has too many responsibilities, should some responsibilities be reallocated or should more people be assigned to the role?
  • If only one person is Accountable, is it reasonable to expect that person to make all decisions and could it threaten the project by creating a bottleneck?
  • Here are some things to look for when reviewing the Task axis (whether this is horizontal or vertical):
  • If there is a task with no one Responsible, should someone be assigned or should the task be eliminated?
  • If there is a task where no one is Accountable, who has decision-making authority?
  • If there are multiple people Accountable for a task, avoid conflicts by making a single person accountable. 
  • If too many people must be consulted, evaluate whether one person can be assigned who talks with others involved.

It is common, during the life of a project, to have team members experience role confusion. A RACI matrix is useful for clearly identifying roles associated with a project and improving productivity, especially when you’re suffering from role confusion. Some signs of role confusion are:

  • Concern over who makes decisions —Decision-makers are usually labeled as Accountable, but it may be that decisions are being made by the Responsible party. If that’s the case, the team should know who makes decisions in each situation.
  • Finger pointing —If work is not completed on time, finger pointing may result. The key to avoiding this is knowing who is Responsible. 
  • Poor resource allocation —The RACI Matrix should make resource allocation very clear, but sometimes a single task can be extremely taxing, leading to some issues concerning who should be doing what and when.
  • Lack of action because of ineffective communications —If someone is not Informed, they may not know to perform a task.
  • Too many consultations because the wrong people are consulted —The Consulted should be clearly labeled to avoid jeopardizing the project schedule.

It is the duty of a project manager to step in if role confusion is suspected and clarify roles to ensure that everyone is aware of expectations.

Smartsheet for Project Management

Smartsheet is a spreadsheet-inspired project management platform with powerful collaboration and communication features. By providing a broad range of views including Gantt, calendar, grid, and dashboards, you can manage projects the way you want. Track project requirements, store documents, create timelines, and organize key details.

project rollup sheet dashboard

Watch the Demo

Discover a more collaborative way to manage projects.

types of assignment matrix

What Is a RACI Chart? How to Use RACI to Assign Project Roles

types of assignment matrix

It’s a fact: Complex projects make it easy for teams to lose track of tasks.

You might have an air-tight project plan and a stellar team to back it up. But if you’re not crystal clear about assignments—or even involvement—on a task level, confusion, crankiness, and even demotivation will creep into your project team.

Lucky for you, avoiding those issues is as simple as creating a RACI chart. 

In this article, we’ll explain what RACI stands for and how it’s used in project management. We’ll also share a few practical examples so you can see how to apply the RACI model to different types of projects.

What is a RACI chart?

Raci definitions explained, benefits of the raci model in project management, how to make a raci chart, raci rules and best practices.

  • RACI chart examples

When to use or skip a RACI chart for your project

Common raci pitfalls and how to avoid them.

A RACI chart—also known as a responsibility assignment matrix —is a diagram used in project management to define team roles across 4 categories: Responsible , Accountable , Consulted , and Informed . It helps clarify who does the work, who calls the shots, whose opinion matters, and who needs to stay in the loop for each task, milestone, or decision.

A RACI chart enables you to visualize roles and responsibilities at a more granular level than simple resource assignments. That way team members and stakeholders know what’s expected of them so confusion doesn’t get in the way of project success.

Example of a simple RACI chart

RACI stands for Responsible , Accountable , Consulted , and Informed . Each letter in the acronym represents the level of ownership each person involved in a project will have on an individual deliverable. 

This simple chart gives you an at-a-glance view of RACI meanings and how many people to assign to each role in your RACI matrix .

RACI definitions matrix with meanings for responsible, accountable, consulted, and informed

R = Responsible

This team member does the work to complete the task. Every task needs at least one Responsible party, but it’s okay to assign more.

Examples of people you might assign to the Responsible role:

  • Content writer
  • Graphic designer
  • UI/UX designer
  • Software developer
  • Business analyst
  • QA specialist

A = Accountable

This person delegates work and is the last one to review the task or deliverable before it’s deemed complete. On some tasks, the Responsible party may also serve as the Accountable one. Just be sure you only have one Accountable person assigned to each task or deliverable. (Note: It might not be your project manager!)

Examples of people you might assign to the Accountable role:

  • Project manager
  • Product manager
  • Department head

C = Consulted

Every deliverable is strengthened by review and consultation from more than one team member. Consulted parties are typically the people who provide input based on either how it will impact their future project work or their domain of expertise on the deliverable itself.‍

Examples of people you might assign to the Consulted role:

  • Software architect
  • Content editor
  • Creative director
  • Compliance officer
  • Security specialist
  • Legal counsel

I = Informed

Informed stakeholders simply need to be kept in the loop on project progress, rather than roped into the details of every deliverable.

Examples of people you might assign to the Informed role:

  • Executive leadership
  • External clients
  • Team members assigned to dependent tasks
  • Customer support team
  • Administrative staff

Responsible vs Accountable meanings in RACI

The same person can be both Responsible and Accountable for a task in RACI—including a project manager. But they’re not one and the same. So what’s the difference?

  • Responsible is a task-oriented designation that applies to the person (or people) actually completing the work. A whole team can be responsible for the execution of one task. ‍
  • Accountable is an outcome-oriented designation that applies to a single person who reports on the work, whether in status updates or upon delivery. Being Accountable means you must answer for and/or sign off on the deliverable and deal with the consequences if it falls short of goals.

Side-by-side comparison of responsible vs accountable in RACI

At its core, the RACI model helps you set clear expectations about project roles and responsibilities. That way you don’t have multiple people working on the same task or against one another because tasks weren’t clearly defined on the front end.

A RACI chart also encourages team members to take responsibility for their work—or defer to someone else when needed. Essentially, you’ll remove personal judgment and politics from your process and focus on your team’s ability to act responsibly within a framework you’ve created. Sounds pretty sweet, huh?

Building a RACI chart for your project is a relatively simple task. The hardest part is thinking through all the people involved in your project and what role makes the most sense for individuals at each stage of work.

You’ll want to map out a RACI chart for your project during the planning stage. This ensures responsibilities are clearly defined before work begins and gives you time to adjust to avoid any gaps or overlaps in assignments.

Here are the basic steps for making a RACI chart:

  • List key project phases, tasks, and/or milestones in a column down the left side of your chart. You can get as detailed as you want, depending on the complexity of your project (and attention-span of your project team and stakeholders). 
  • Enter the people involved in your project across the top row of your chart. Each individual should serve as the header of a single column. You can use names or job roles—whatever makes sense for your team and project.
  • Go line by line down the chart, and assign each person across the row an R, A, C, or I to indicate the role they’ll play on that particular task.

Once your RACI chart is good to go, you can create a communication plan that aligns with the roles you’ve outlined for project teams and stakeholders.

Want to save time? Download our free RACI Excel template , or see how TeamGantt's built-in RACI feature works.

Using a RACI chart is a whole lot easier when you follow a few simple rules. Once your RACI chart is complete, review it to be sure it meets these criteria:

  • Every task has at least one Responsible person.
  • There’s one (and only one!) Accountable party assigned to each task to allow for clear decision-making.
  • No team members are overloaded with too many Responsible tasks. You can use TeamGantt’s Workloads report to check availability across all your active projects.
  • Every team member has a role on each task. (It’s not uncommon for some folks to be Informed on most tasks.)

These best practices can help you get the most out of RACI:

  • Focus on project tasks, milestones, and decisions in the RACI chart. Avoid generic or administrative to-dos like team meetings or status reports .
  • Align the tasks in your RACI chart with your project plan so there’s no confusion about details and due dates. (TeamGantt does this work for you by tying your RACI chart directly to your plan!)
  • Keep RACI definitions close by because they can be tough to remember sometimes! ‍
  • Assign the Responsible team members to tasks in TeamGantt .

Lay a clear path to success with a visual plan that’s easy to understand, and keep everyone in sync with flexible workflows and team collaboration.

types of assignment matrix

RACI chart examples: Practical application in the real world

Let’s take a closer look at how you might put the RACI model to work on real-life projects. 

Producing a marketing handout

We’ll start with a simple example. Imagine you’re creating a RACI chart for a handout your marketing manager will distribute at an industry conference. 

Basic tasks for this project might include:

  • Write project brief
  • Create content
  • Design handout
  • Review first draft
  • Update handout
  • Approve final
  • Send to printer

In this project example, we’ve assigned RACI roles to 7 key team members:

  • Marketing manager
  • Editorial director

Sample RACI chart for the production of a marketing handout.

Let’s zoom in on the RACI roles we mapped out for the Create content task example so you understand the why behind these assignments. 

  • Responsible : The content writer is listed as Responsible for this task, so that’s who will actively work on content creation.
  • Accountable : The editorial director is listed as Accountable for this task because that’s who is ultimately on the line for content quality and accuracy. Once the content is written, she’s the one who will review it to ensure it meets their company’s editorial standards.
  • Consulted : The marketing manager is listed as Consulted . Since the marketing manager is the subject matter expert for the presentation, the writer can go to them for input or help filling in content gaps along the way.
  • Informed : Several people have been assigned to the Informed role, though for different reasons. Since the Design handout task depends on this one, we want to make sure the writer keeps the creative director and designer informed on the status of content creation. The project manager and CMO are listed as Informed simply because they want to be kept in the loop about how work is progressing.

Developing a new software product

Now let’s look at a more complex project example. 

Developers who use an Agile workflow to tackle the job likely know what they need to do because there’s a constant stream of communication. But cross-functional departments and senior leaders might need more clarity. 

Here’s how you might map RACI roles to major tasks in a software development project , broken down by key tasks and RACI roles. (For the Informed assignments, we only listed people who need detailed progress updates to keep our example easier to read.)

Market Research

  • Responsible : Business Analyst, Marketing Manager
  • Accountable : Product Manager
  • Consulted : Sales Representative, Customer Support
  • Informed : Project Manager, Software Developers

Requirement Gathering

  • Responsible : Business analyst
  • Accountable : Product manager
  • Consulted : UI/UX Designer, Software Architect
  • Informed : Project manager, QA analysts

Design and Prototyping

  • Responsible : UI/UX Designer
  • Consulted : Business analyst, software developers
  • Informed : Marketing manager, QA analysts

Software Development

  • Responsible : Software Developers/Engineers
  • Accountable : Software Architect
  • Consulted : Product Manager, QA Analysts
  • Informed : Project Manager, Technical Writer
  • Responsible : QA Analysts/Engineers
  • Accountable : Project manager
  • Consulted : Software Developers, DevOps Engineer
  • Informed : Product Manager, Technical Writer
  • Responsible : DevOps Engineer
  • Accountable : Project Manager
  • Consulted : Software Developers, QA Analysts
  • Informed : Product Manager, Customer Support

Maintenance

  • Responsible : DevOps Engineer, Software Developers
  • Consulted : QA Analysts, Technical Writer
  • Responsible : DevOps Engineer, QA Analysts
  • Consulted : Software Developers, Technical Writer

Marketing and Sales

  • Responsible : Marketing Manager, Sales Representative
  • Accountable : Marketing Manager
  • Consulted : Product Manager, Customer Support

User Training

  • Responsible : Customer Support Specialist
  • Consulted : Technical Writer, UI/UX Designer
  • Informed : All project team members

A RACI chart serves just about every project well. But it’s especially helpful when tasks require multiple resources, run concurrently, or depend on other tasks.

Here are a few scenarios when the RACI model is useful:

  • The decision-making or approval process could hold up the project.
  • There’s conflict about task ownership or decision-making.
  • The project workload feels like it’s not distributed evenly.
  • You experience turnover on a team and need to onboard someone quickly to a new role.

Of course, not all teams and projects are created equally. You might work with a team who just happens to communicate really well and stays on top of their own work. (Lucky you!) Or maybe your project is small enough that it would be silly to take the time to go through this exercise. 

In cases like these, don’t worry about taking the extra step of creating a RACI chart. Just be sure you have a clear plan in place to guide your team and project.

Further reading : How to Create a Realistic Project Plan: Templates & Examples

Now let’s walk through a few common mistakes that could hinder your RACI chart’s effectiveness.

Failing to get buy-in from your team and stakeholders

Creating a RACI chart in a vacuum is never a good idea. In a best-case scenario, you’d sit down with your team and stakeholders to walk through the role assignments on each task. But let’s be real: That’s not always possible.

Just be sure everyone represented has acknowledged and agreed to the roles and responsibilities you’ve laid out. More importantly, you want to check that your chart eliminates any further project confusion.

Setting it and forgetting it

It’s easy to build a RACI chart at the start of a project, then let it collect dust once the real work begins. But remember: This chart will defend you against mishaps that arise when you have too many cooks in the kitchen or a team member who thinks someone else is handling the work.

That’s why it’s important to keep these roles top of mind throughout a project’s life cycle. You can do this by reviewing RACI assignments for upcoming tasks in weekly status update meetings and making sure everyone involved in a project has easy access to the RACI chart. 

In TeamGantt, you can assign RACI roles directly in your project plan so they’re clearly visible as team members work their way to the finish line.

Overcomplicating stakeholder communication

If you have a lot of Consulted and Informed roles on your chart, make sure you have an easy and lightweight way to keep them informed. It could be as simple as making sure department heads and senior leaders have access to your project plan so they can follow progress along the way. 

Managing a project with external clients or stakeholders? Sharing a view-only link to your project in TeamGantt is a great option for looping in folks outside your organization.

Further reading: A Project Manager’s Guide to Effective Stakeholder Management

Keep teams in sync—and accountable—with TeamGantt

A RACI chart is a simple tool that makes projects easier to manage by creating less confusion and more accountability. But you’ve got more than roles and responsibilities to keep straight.

TeamGantt makes it easy to build a project plan your whole team can contribute to and collaborate on. Everything happens online, so you can stay on top of deadlines and monitor progress in real time.

Use our built-in RACI chart to assign roles and keep them visible from project start to finish, so everyone knows how they contribute to success.

Try TeamGantt’s Pro Manager plan free for 30 days!

types of assignment matrix

  • Contact sales

Start free trial

How to Make a Responsibility Assignment Matrix for a Project (Template Included)

ProjectManager

The most important resource you’ll employ to deliver the project is people. They have to fit into the schedule and maintain the project budget. Defining what their roles and responsibilities are when executing tasks and delivering on the project goals is an important part of controlling the project.

How can you coordinate all the people who are involved in a project so they know what they’re doing and don’t block others from doing what they are assigned? Using a responsibility assignment matrix can help. An assignment matrix gives your project a team that gets things done.

What is a Responsibility Assignment Matrix in Project Management?

A responsibility assignment matrix (RAM) is a project management chart used to identify and define the various people and organizations and outline each of their roles in working on tasks or delivering a part of the project.

Project managers use an assignment matrix to clarify what cross-functional teams do within the boundaries of the project and its numerous processes. Sometimes a responsibility assignment matrix is required when responding to a request for proposal (RFP).

The responsibility assignment matrix can also be called a RACI matrix, which stands for responsible, accountable, consulted and informed.

  • Responsible: Notes who is responsible for executing the task, which is then assigned to them.
  • Accountable: Notes who has decision-making authority and how that power is delegated throughout the project team.
  • Consulted: Notes who is able to offer insight into the task, from team members to stakeholders.
  • Informed: Notes who is updated on what in terms of progress and performance, as well as when and how this information is disseminated.

This creates a map of connections between activities and project team members. Depending on the size of the project, there can be several assignment matrices used for various project levels.

Why Create a Responsibility Assignment Matrix?

The assignment matrix identifies what everyone on the team is responsible for, which means not only what their duties are, but how they participate in the project. Some will have defined tasks, others will offer help with work, while there are some who are designated as decision-makers. These groups all have an identity and function within the project to help guide it towards a successful end.

Clear communication leads to more efficient projects. An assignment matrix facilitates better communication between team members and provides transparency by creating a system to make sure everyone is updated and always on the same page. Belaboring communications can bog down a project with too many pointless meetings and confusing interactions in which people try to understand what they’re supposed to be doing. Using the responsibility assignment matrix helps, but having project management software that connects teams in real-time is ideal.

ProjectManager manages project information by allowing teams to attach files directly to tasks, and our unlimited file storage keeps important project documents at your fingertips anywhere, anytime. Commenting on tasks can save time and tagging others in the project team creates a communication process that avoids the pitfalls of redundancies or unnecessary meetings.

Gantt chart screenshot with a team collaboration pop up

When Should a Responsibility Assignment Matrix Be Created?

The responsibility assignment matrix would be created at the start of the project. You’d want to have everyone on the project team aware of where they stand in terms of their involvement before they start executing tasks.

As much as its use is a preventative measure, it can be used prescriptively. If you’re deep into the project and things are not moving as planned, there could be communication gridlock. If team members are not in the loop, or misconstrue what they’re supposed to be doing, using a responsibility assignment matrix might untie up those knots in the communication channel.

If there’s a problem with leadership overruling suggestions on how to advance the project and this is seen as a problem, it’s likely that the roles and responsibilities of the project team need refining. The responsibility assignment matrix defines who has authority to make decisions and using it or revisiting can determine if the right people are in that position.

In fact, any of the definitions might need reexamining at any phase in the project. Perhaps tasks are falling behind schedule. This could be because team members aren’t aware of what tasks they own. Anytime a delay occurs, returning to the assignment matrix is a good first step, even if you went through the process as you should during the planning stage of the project.

How to Create a Responsibility Assignment Matrix

The actual making of a responsibility assignment matrix is not as difficult as getting everyone on board with what their roles and responsibilities are.

Therefore, you want to include your team in the process, get their input and eventually buy-in without spending too much time and energy on the process. Follow these steps to make sure everyone is in agreement and you’ll have a successful responsibility assignment.

  • Identify all the participants involved in the project, from team members to stakeholders and everyone in between.
  • List all deliverables associated with the project. Use a work breakdown structure to make sure you don’t miss any.
  • Meet with team members on how to execute the tasks to create the deliverables. Every task needs to be discussed in terms of the team’s responsibility and authority.
  • Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project.
  • Where the tasks meet the project team member, assign whether they’re responsible, accountable, consulted or informed.
  • When completed, share the responsibility assignment matrix with the project team and stakeholders and hold a meeting if necessary to make sure everyone understands their part in the project. If you’re working in a shared space, print out a copy and post it.

Free Responsibility Assignment Matrix Template

Using a RACI template is a shortcut that sets up your team and the project for success. ProjectManager is more than an award-winning software that organizes tasks, teams and projects to streamline work and boost productivity, it’s also the online hub for all things project management.

Among the hundreds of blog posts, guidebooks and tutorial videos are dozens of free templates that can help you through every phase of your project’s life cycle. Using our free RACI template will help you guide all the project teams better, allowing them to know where they stand in relation to the project and what their level of responsibility and accountability is.

Use it at the start of the project to avoid delays and untangle any communicative knots that are preventing the project from progressing as planned. To keep your project on track, download our free RACI template and get a head start on building a workable responsibility assignment matrix.

RACI Matrix Template for Excel

Best Practices

Using our free RACI template is a good start, but you have to make sure you fill it in correctly. A responsibility assignment matrix is only as good as the effort put into creating it. Here are some best practices to apply when you’re in the process of building your assignment matrix.

  • Involve the team: They’re the ones who will be executing the work. You want their input and buy-in to avoid any costly mistakes or time-consuming questions about what wasn’t made clear at the beginning of the project.
  • Identify every single task: Identify all the tasks required to reach your final deliverable. Once you have that thorough list make sure that there is only one person on the team who is accountable.
  • Update your RACI regularly: Make sure that each new one is clearly marked as the most current version and is distributed to everyone on the team. There will be times when you’ll want to revisit the responsibility assignment matrix or changes in personnel will require an edit.
  • Share responsibility viably: One person shouldn’t have to shoulder the bulk of the responsibilities for the project and you want to give authority throughout the project team and not just among the very top management team.
  • Optimize tasks: Managers can use the RACI matrix to see if too many team members have been assigned to a task. Maybe these workers could be spread out for greater productivity. There could be too many people listed as consulted, which slows down the process. The assignment matrix is endlessly useful.

How ProjectManager Helps You Manage Projects Better

ProjectManager is a cloud-based tool that connects everyone in real-time to facilitate planning, monitoring and reporting on the project. It works to give everyone on the project team a job and the knowledge as to where they have authority and when to consult others, as well as defining the reporting process.

Let’s look at the people who are responsible, for example, the team who execute the project. Once invited into the software, you can share the project plan, assign them tasks, add detailed direction, add a deadline and tag for priority and more. The teams can then collaborate by attaching files and images to the tasks and commenting in real-time to work better together.

A screenshot of the Team collaboration user interface in ProjectManager

Those who need to stay informed of the project can do so by also getting invited into the project and sharing plans and schedules with them. Stakeholders can stay updated with reporting features that can generate reports on project variance, cost, time and more with one click. Then share them as a PDF. Reports can even be quickly filtered to zero in on the data stakeholders are interested in.

a screenshot of the status report generation screen in ProjectManager

The responsibility assignment matrix can help you reallocate your resources when things aren’t progressing as planned. Use our software to get further insight. The resource management features include a workload chart that’s color-coded so it’s easy to see who has too many tasks and who can take on more work. Then you can simply reallocate those resources from the workload page to help your team work more productively.

color-coded workload chart

ProjectManager gets you organized, keeps your team focused on their tasks and stakeholders in the loop. Gain efficiencies throughout every aspect of your project’s life cycle with an online Gantt chart to schedule work and kanban boards, a visual workflow feature that provides transparency into production. All that and it’s on a collaborative platform to keep everyone connected. Try ProjectManager today for free.

Click here to browse ProjectManager's free templates

Deliver your projects on time and on budget

Start planning your projects.

A Place for Project Professionals

A Definitive Guide to the RACI Chart

August 5, 2019 By Fahad Usmani 4 Comments

RACI Chart

Smaller teams are much easier to manage, because you know them personally and you can make sure they are all aware of their roles and responsibilities.

However, it becomes more difficult to manage a growing team efficiently, leading to compromised organization and potential conflicts.

Therefore, you will use RACI Chart to solve these issues. The RACI Chart is a simple tool that the PMBOK Guide describes in plan resource management process.

The RACI Chart is also known as a RACI Matrix or Linear Responsibility Chart (LRC).

What is a RACI Chart?

A RACI Chart is a type of Responsibility Assignment Matrix (RAM) that shows the roles and tasks assigned to each team member visually.

It identifies the roles and responsibilities of the individuals in tasks and projects. A glance at this chart can help you find out who is assigned to what in particular.

A RACI Chart is useful at all levels of project management; if the project is large, you can create it to connect high-level work packages with the project team, group, or unit. Also, you can make a low-level RACI Chart within teams, groups, or units, and use it to connect the tasks or activities with each individual.

What Does RACI Mean?

RACI stands for Responsible, Accountable, Consult, and Informed.

Responsible

This team member is responsible for carrying out the activities required to complete the task. A task must have at least one responsible team member, who is in charge of decision making. A task can have more than one responsible team member.

Accountable

This team member is accountable for the job. In a small project, a team member can be responsible and accountable for the task, but it’s a good idea to separate these roles for larger projects. This team member will be answerable to the project manager about the progress and review of the tasks.

Please keep in mind that all tasks must have a responsible and accountable team member. Though a task can have multiple responsible parties, it is best to have only one that is accountable to individual tasks to avoid confusion and allow faster decision making. There can be more accountable team members for a task if the task is big or complex.

Consulting team members give their input and help define each task. These individuals may be directly impacted by the deliverable being completed and they will interface with you, the project manager, when presenting the deliverable.

These team members need to be contacted if any technical clarification is needed or if the deliverable has to be changed or reviewed.

Responsible and consulting team members must have two-way communication.

These team members have no direct involvement in a particular task but are kept informed about progress. They have the potential to be a replacement if another member leaves the project or is assigned somewhere else.

There is one-way communication with this group of team members.

Benefits of a RACI Matrix

A RACI Matrix is beneficial to managing a project in many ways. Some are as follows:

  • Drawing a RACI Chart is easy to use and read.
  • It shows how employee workload is managed.
  • It prevents team members from being overworked.
  • It clarifies who should be contacted for a particular task.
  • It removes role confusion.
  • It helps eliminating unnecessary tasks.
  • It visualizes responsibility and accountability for a particular task.
  • It helps to avoid conflict.
  • It ensures smooth handoffs.
  • It helps the project manager redistribute work, if needed.
  • It is a great communication tool.
  • It allows the project manager to address particular concerns with the correct team member.
  • It enables you to make faster decisions.
  • It helps with resource allocation.
  • It avoids conflicting assignments and responsibilities.
  • It helps team members take responsibility and leadership roles.

Drawbacks of a RACI Chart

The following are a few drawbacks of a RACI Chart:

  • Complex projects make for extensive RACI Charts with many team members. It can also be difficult to identify which individual is responsible for any given task.
  • A RACI Chart lacks flexibility when it comes to changing assignments, and responsibility and accountability can get mixed up if they are not defined well.

When Should you use a RACI Matrix?

A RACI Chart can be very helpful in managing projects in the following ways:

  • If you want to know whether a specific team member is doing their assigned work.
  • If there is conflict regarding who will manage a particular task
  • If you want to shift a role from one team member to another.
  • When management wants to see the role of a team member.

How to Develop a RACI Chart

Creating a RACI Chart is a simple process. You can create one with an Excel sheet or word processor, though the former is recommended as tables are vital to the chart.

The Steps of Creating a RACI Chart:

The steps of creating a RACI Charts are as follows:

List the Role

First of all, make a list of all the roles involved in your project, such as project manager, planning engineer, foreman, construction engineer, quality control engineer, etc.

Enter these roles in the top row of the table as shown in the picture. You can use the names of team members instead if you choose to.

Don’t forget to review the project charter , as it can provide valuable information on important stakeholders.

There is an advantage to entering roles into the chart For example, if a team member leaves the project, you don’t have to update the RACI Chart. On the other hand, entering names makes the project manager’s job easier when many team members share a similar role.

List the Tasks

Now review the project work, breaking it down into tasks and listing them all: developing project plans, identifying risks, testing deliverables, maintaining records, or what have you.

Once this is done, you can enter the information in the first vertical column, as shown in the image.

RACI matrix template

Assign the Value

Now for each task, you will assign a value:

  • For responsible, you will use “R.”
  • For accountable, you will use “A.”
  • For consult, you will use “C.”
  • For informed, you will use “I.”

RACI chart example

Some Things to be Aware of While Creating a RACI Matrix

It’s often challenging to distinguish between responsibility and accountability, especially when these roles are shared. This happens when the project is big or complex and requires many resources. You will want to sit down with your team members to define the boundaries and make sure that they understand them.

Sometimes a team member in the informed category may feel left out. You have to explain them why they are kept in that particular group to continue getting their support.

If there are any changes in the roles or tasks, make sure that the RACI Chart is updated to avoid confusion and miscommunication.

A RACI Chart is an excellent tool to manage projects and avoid conflict; however, if not prepared well or if not all stakeholders are on board, there may be issues.

While creating a RACI Chart, please keep the following points in mind:

  • Every task must have one person who is responsible.
  • Every task must have one accountable person.
  • Make sure that the accountable team member has the authority to help the responsible team member complete the job.
  • Avoid using too many tiny tasks. This makes the chart messy.
  • Try to avoid giving too many responsibilities to a single team member.
  • Avoid sharing accountability for a single task.

Some Alternatives to a RACI Chart

You will find many types of Responsibility Assignment Matrixes (RAMs) used in project management; however, they are not discussed here, as they are not mentioned in the PMBOK Guide and are also not necessary for the PMP exam.

Some commonly used RAMs are as follows:

  • RATSI (Authority, Responsible, Task, Support, Informed)
  • RASCI (Responsible, Accountable, Supportive, Consulted, Informed)
  • CARS (Communicate, Approve, Responsible, Support)
  • DACI (Drivers, Approver, Consulted, Informed)
  • CLAIM (Contributes, Leads, Approves, Informed, Monitors)
  • PACSI (Performed, Accountable, Control, Suggested, Informed)
  • RAPID (Recommend, Agree, Perform, Input, Decide)

A RACI chart is helpful in assigning work and avoiding conflicts. Stakeholders’ support is vital for a chart to be effective. Always update it as soon as any change occurs, as outdated information will nullify a RACI Chart. Make sure all stakeholders understand the terms and agree.

Do you use a RACI Chart in your project or any other type of RAM? Please share your experiences in the comments section below.

This topic is vital for those studying for the PMP exam. You may see questions on the exam that test your understanding of RACI Charts.

Renson Wright says

August 7, 2019 at 12:39 am

CLAIM the meaning of “I” is omitted. I think it stands for informed . The information is clear and easily applicable. The RACI chart is an essential for monitoring and controlling projects effectively. Thanks a million, Fahad. Keep up the great work.

Fahad Usmani says

September 1, 2019 at 4:48 pm

Hello Rensom, thanks for letting me know about it.

Yamin Kamboh says

August 7, 2019 at 12:29 pm

I use these charts through Primavera P6 but I cannot say those are exactly the same but the concept is the same as of RACI. It is prepared there for all the teams working on our enterprise structure. Later, that is further sent to on-site teams but is updated from head office only for top-level executives.

September 1, 2019 at 4:51 pm

A RACI chart can be designed in many ways depends on the requirements.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

types of assignment matrix

  • Product overview
  • All features
  • Latest feature release
  • App integrations

CAPABILITIES

  • project icon Project management
  • Project views
  • Custom fields
  • Status updates
  • goal icon Goals and reporting
  • Reporting dashboards
  • workflow icon Workflows and automation
  • portfolio icon Resource management
  • Capacity planning
  • Time tracking
  • my-task icon Admin and security
  • Admin console
  • asana-intelligence icon Asana AI
  • list icon Personal
  • premium icon Starter
  • briefcase icon Advanced
  • Goal management
  • Organizational planning
  • Campaign management
  • Creative production
  • Content calendars
  • Marketing strategic planning
  • Resource planning
  • Project intake
  • Product launches
  • Employee onboarding
  • View all uses arrow-right icon
  • Project plans
  • Team goals & objectives
  • Team continuity
  • Meeting agenda
  • View all templates arrow-right icon
  • Work management resources Discover best practices, watch webinars, get insights
  • Customer stories See how the world's best organizations drive work innovation with Asana
  • Help Center Get lots of tips, tricks, and advice to get the most from Asana
  • Asana Academy Sign up for interactive courses and webinars to learn Asana
  • Developers Learn more about building apps on the Asana platform
  • Community programs Connect with and learn from Asana customers around the world
  • Events Find out about upcoming events near you
  • Partners Learn more about our partner programs
  • Asana for nonprofits Get more information on our nonprofit discount program, and apply.

Featured Reads

types of assignment matrix

  • Project management |

Your guide to RACI charts, with examples

Julia Martins contributor headshot

Can you identify exactly who’s doing what by when for each task, milestone, and deliverable in your project? If not, you might need a RACI chart.

RACI is an acronym to help teams clarify project roles and figure out who the responsible party is for any given task. Whether you've never heard of RACI before or you’re considering creating a RACI chart for your next project, here’s everything you need to know about how to create and use these charts.

What is a RACI chart?

Responsible.  This person is directly in charge of the work. There should only ever be one Responsible role per task so you know who to go to with questions or updates. If a task has more than one Responsible person, you can lose clarity and cause confusion. Instead, aim to add additional collaborators as some of the other RACI roles, which can have more than one person.

Accountable.  The Accountable person is responsible for overseeing overall task completion, though they may not be the person actually doing the work. There are two ways to assign an Accountable role. Sometimes, the Accountable is the project manager (or even the Responsible, though in that case the person is taking on two different roles during the task workflow). In these cases, the Accountable is responsible for making sure all of the work gets done. In other cases, the Accountable is a senior leader or executive who is responsible for approving the work before it’s considered complete. Like the Responsible role, there should only ever be one Accountable.

Consulted.  This will be the person or people who should review and sign off on the work before it’s delivered. There may be multiple Consulted roles for each task,  project milestone , or deliverable.

Informed.  This is the person or group of people who are informed about the progress and completion of work. They probably are not involved in any other aspect of the deliverable.

When should I create RACI charts?

RACI charts are a helpful way to track each stakeholder’s role for a task, milestone, or deliverable—especially if you’re managing a complex project with many decision makers and subject matter experts. With a RACI chart, you can prevent poor decision making and avoid roadblocks in the approvals process that could impact overall project success.

These charts, while different from PERT charts , are especially useful if your stakeholders may be taking on different roles throughout the project. For example, there could be a stakeholder who is Responsible on one deliverable but Informed on another. With a RACI chart, you can clearly outline these details and make sure everyone knows who’s responsible for what.

Example of a RACI chart

To build a RACI chart, list every task, milestone, or deliverable for your project. Then, identify who the Responsible, Accountable, Consulted, and Informed team members are for each one.

Let’s say you’re updating the homepage on your website.  Project stakeholders  include:

Head of website

Web developer

You want to create a RACI chart for five tasks and deliverables:

Update homepage CTAs

Update customer story on homepage

Revamp website design

Improve homepage loading speed

Update homepage design

The RACI chart would look like:

Responsible: Copywriter

Accountable: Web developer

Consulted: Head of website

Informed: Designer

Revamp video on homepage

Responsible: Designer

Informed: Copywriter

Responsible: Web developer

Informed: Copywriter & Designer

Pros and cons of RACI charts

Ultimately, the question is: should you create a RACI chart? While RACI charts are a useful tool to identify project responsibilities, they can get a little cumbersome over the lifecycle of a project. Here are the pros and cons of creating a RACI chart for your team’s work:

The benefits of RACI charts

Clear project roles and responsibilities can help your team move fast and reduce confusion about who’s working on what. With a RACI chart, you can ensure you don’t have two team members working on the same thing. As a result, you’ll have an easier time  collaborating  with your team.

RACI charts are also particularly helpful when the decision-making process is split between tasks. There might be scenarios where the Informed on one task or milestone is the Responsible or Consulted on another—in order to have that clearly defined, it’s helpful to track this work in a RACI chart.

RACI chart pitfalls (and how to avoid them)

RACI models focus on the granular, instead of capturing work at the project level. You might know who the Consulted is on a particular task—which is helpful—but knowing that doesn’t help you understand how various stakeholders interact with the broader project work.

Additionally, if you attempt to write out each task and each role, your RACI chart can get bulky. Worse, if your project changes in some way, your RACI chart would immediately become outdated. That can make it hard for you to gain real-time clarity about where each task is in your project workflow.

RACI charts are limited because they aren’t able to adapt to your project needs in real time. In order to establish clear expectations and eliminate confusion on the project level, you need a  project management tool .

Take your RACI chart to the next level

With project management software, every task has an assignee—that’s the Responsible. You can see work on the project level, so the Accountable and Informed don’t have to check in via email or status meetings. And, for any approvals you need from your Consulted, you can track reviews and approvals in one place. That way, your entire RACI team has a central source of truth for all of the work being done.

[Product UI] Brand campaign RACI chart (Lists)

Instead of having your RACI chart separate from where the work is happening, project management tools capture the topic, assignee, and other important information like the task due date or relative importance. That way, your entire project team has visibility into who’s doing what by when—and you’re not relying on a single person to manage and update your RACI chart. Project management tools update in real time, so you can see exactly where you are in the approval process.

Track who’s doing what by when

Clear team roles and responsibilities help you hit your deliverables on time. Tracking different and complex stakeholder responsibilities in a RACI chart can help you do that—but RACI charts are just the beginning. Learn more about  work management , and how your team can benefit.

Related resources

types of assignment matrix

New site openings: How to reduce costs and delays

types of assignment matrix

8 steps to write an effective project status report

types of assignment matrix

Provider onboarding software: Simplify your hiring process

types of assignment matrix

Inventory management software: How to control your stock

Pursue the Next You in 2024 with 20% Tuition Reduction on September Courses!

How to Streamline Roles and Promote Team Collaboration with an Effective RACI Chart

Project team works together in an office.

Last Updated November 7, 2019

Imagine for a moment a homeowner’s association is tasked with a project of throwing a summer barbeque bash for the neighborhood. Everyone shows up at the same time, mills around trying to find a task and chaos ensues as homeowners arrive before food has been cooked. Now imagine that same team of people tasked with the same project, but in this team, each individual is assigned a specific task, from grilling to game planning. Now, this team can immediately get to work, and it’s much more likely the neighborhood bash will be an enjoyable event.

In any project, whether the task at hand is throwing a summer party or helping an organization with a technology transformation, when roles and responsibilities for everyone involved are clear, the project is more likely to be executed smoothly. In addition, project managers are often beholden to multiple stakeholders, and keeping those key players informed and involved throughout the lifecycle of the project is critical to project success.

What is a RACI Chart?

One method for streamlining accountability on a project is the use of a responsibility assignment matrix, specifically, a RACI chart. The RACI chart describes how the matrix assigns each task or deliverable, assigns an owner, and denotes who else is involved, ultimately classifying involved parties into four categories: responsible, accountable, consulted and informed. This approach is widespread among project managers, according to “ A Guide to the Project Management Body of Knowledge ( PMBOK® Guide), Seventh Edition,” as it can eliminate confusion on who is in charge of, or accountable for, a specific project task.

The first step to developing an effective RACI chart is understanding what the various categories represent:

Responsible: This is the active party, the person who executes the task or completes the deliverable. This includes doing the work as well as making decisions. In some cases, a task or deliverable may have more than one responsible party; for best results, this role should be limited to as few people as possible for each task.

Accountable: This individual is responsible for ensuring the task is completed correctly and meets all specifications. While this person is not in charge of doing the work, they do delegate it and are responsible for approving the job that is completed. Like the previous category, the number of people assigned to this role should be limited for each task to ensure clarity in ownership.

Consulted: This group, typically comprising of subject matter experts, help provide supporting information for the person(s) responsible for working on the task. Communication with this group is two-way and is required before the task can be completed.

Informed: This group of people must be kept updated on the progress of the task or deliverable, as these individuals may be impacted by the outcomes. They typically are not involved in the feedback or review cycle but should be contacted after a decision or action is made.  

How RACI Charts Influence Project Outcomes

Planning is a critical component of project management and project success, and establishing roles and responsibilities is a key component of the planning stage. Implementing a RACI chart offers several advantages for project participants, including:

  • Streamlined communication – All parties know precisely who to ask questions to, who to consult and who to inform.
  • A controlled set of stakeholders – By pre-defining these responsibilities, project managers are less likely to be left juggling an unnecessary amount of opinions. Distinguishing consulters from informers can also help avoid a bulk amount of stakeholder feedback .
  • Manages fatigue and overwhelm – Although project managers may hold many responsibilities, a RACI chart helps outline other owners, knowledgeable parties and accountable players to help lift some of the burden and ensure everyone stays informed.
  • Establishes expectations up front – Creating a RACI chart can also help manage conflict later in the project lifecycle, as everyone should visually understand their roles and responsibilities on a project from the beginning.

Using a RACI Chart

RACI charts don’t have to be complex; they can be as simple as listing the work to be done, the resources assigned and the responsibility they hold. Follow these steps to create your own RACI chart:

Step 1: List the names of the people involved in the project – You’ll need to determine if roles or specific names are appropriate. For example, if a single person holds multiple roles, you could specify by role, whereas if multiple people hold similar titles, you might need to specify by name.

Step 2: Break down specific tasks or deliverables – Although this should be a breakdown of the project, it’s important to balance this to ensure the chart doesn’t become cumbersome or impossible to manage.

Step 3: Assign a role to teach task or deliverable, using RACI – Each task must have someone assigned to be responsible and someone assigned to be accountable.

Step 4: Seek buy in from the team – Gather your team, ensure everyone agrees with their assigned roles and responsibilities and allow for questions.

Step 5: Communicate with project stakeholders – Once you have team buy in, meet with stakeholders and get their buy in to establish expectations up front and avoid conflict down the road. The process of collecting buy in from the team and stakeholders is critical to achieving an effective project.

Step 6: Refer to the RACI – This step may seem obvious, but it doesn’t do any good to plan for the project and then not follow the chart as intended. Ensure everyone continues to adhere to the roles outlined in the RACI chart – remember, they approved them in the planning stage.

RACI Chart Example

Let’s go back to that neighborhood (NBHD) barbecue party and create a RACI chart for the homeowner association (HOA).

ActivityHOA – PresidentHOA – TreaurerHOA – Event PlannerNBHDVolunteer Family 1Volunteer Family 2
Send
Invitations
ICAICR
Plan games for kidsICAIRC
Buy foodIAAICR
Reserve parking permitIRAICC
Collect feedback for budgetingRIAC

Keep in mind that RACI charts are useful in many cases but may not be needed in every case.  For example, rapid projects with small teams likely don’t need introduced complexity. Some Agile projects (depending on scope and timeline) may also have an implied role matrix as some roles are pre-defined, such as the Scrum team .

In implementing a RACI chart, a project manager should immediately set expectations for everyone involved. This includes ensuring team members understand when and what they must do, experts knowing when their opinion will be solicited, and stakeholders understanding where they will be informed, and where they will be consulted for input. Following the method can help establish a foundation for a streamlined project and pave the way to stronger relationships that can make a meaningful difference in the success of the project.

PMBOK is a registered mark of the Project Management Institute, Inc.

Interested in expanding your project management expertise? Learn more about Villanova’s Applied Project Management Certificate program and course offerings.

types of assignment matrix

Related Articles

types of assignment matrix

Take the next step in your career with a program guide!

By completing this form and clicking the button below, I consent to receiving calls, text messages and/or emails from BISK, its client institutions, and their representatives regarding educational services and programs. I understand calls and texts may be directed to the number I provide using automatic dialing technology. I understand that this consent is not required to purchase goods or services. If you would like more information relating to how we may use your data, please review our privacy policy .

  • Memberships

Responsibility Assignment Matrix: the Basics and Template

Responsibilty Assignment Matrix - Toolshero

Responsibility Assignment Matrix (RAM): this article explains the Responsibility Assignment Matrix or RAM for short in a practical way. Next to what it is (including an in-depth explanation video), this article also highlights an example, inlcuiding the steps to conduct, to use it during a complex project and downloadable and editable Responsibility Assignment Matrix template to get started. Enjoy reading!

What is the Responsibility Assignment Matrix or RAM?

Project managers like using a RAM to identify the role of the various members of a project team. This matrix is a structural chart in which is visually made clear (on paper or through project management software ) what should be done by whom in cross functional or departmental projects.

In the matrix it is clear what the project tasks, roles and responsibilities are of each of the project team members. It is also referred to as the RACI matrix , VERI matrix or Linear Responsibility Chart (LCR).

Free Toolshero ebook

It’s often used as an integral part of the Work Breakdown Structure .

Responsibility Assignment Matrix (RAM) video (in depth-explainer)

Watch the in-depth video below for a recap of what you’ve just read, so you will remember it more easily!

Responsibility Assignment Matrix example

Despite the simple nature of all information in the matrix memory, it can be very time-consuming to assign each member of the project team with the right tasks and responsibilities.

In addition the appropriate roles must be defined in advance before they are included in the RAM.

RACI Matrix example - toolshero

Figure 1 – The Responsibility Assignment Matrix (RAM) / RACI Matrix

To do this well and accurately, the matrix can be completed using the following steps:

  • Step 1: Identify all the participants and (facilities) supporters of the project.
  • Step 2: Identify all the deliverables for the project.
  • Step 3: Discuss with all team members how they can support each other to achieve the best performance. It is important to define each participant’s responsibilities so that there will be no misunderstandings on who is responsible for completing the tasks at hand.
  • Step 4: The initial draft of the RAM is created, with the activities in the left-hand column and the team members in the project in the first right-hand column. Enter the roles that each person will have in the cells that have been formed. An example of this can be seen in the form of a RACI chart (Responsible, Accountable, Consulted and Informed) above. Note that only one person can be accountable for each task.
  • Step 5: Have the participants in the project approve the RAM (in writing). Again to prevent misunderstandings.
  • Step 6: Any remarks on changes in the RAM can be filed by the participants in writing. Finally, the responsibility assignment matrix will be reviewed and after approval has been obtained, the project can start.
  • Step 7: Interim assessment is important. When it appears that it is better to adjust the RAM, you will have to go back to step 3 and the adjustments must be discussed with all team members.

Responsibility Assignment Matrix and complex projects

The RAM is also suitable for complex projects. When activities are overlooked and the matrix contains incomplete and/or inaccurate information, this will lead to duplicated efforts.

It is therefore advisable to ensure that all information is included in the matrix and that all information is and remains accurate.

The following suggestions contribute to a larger chance of success of a matrix in a complex project:

1. Hierarchy of charts

Divide the RAM into separate graphs so that a distinction can be made according to priorities .

The RAM with the highest levels identifies the high-priority activities within the project.

From this point RAM-graphs can be developed that have been derived from this higher level.

2. Involvement

By involving all the members of the project team in the development of the RAM, they will know exactly what is expected of them and they will participate and be (more) committed to using their own specializations.

3. Written representation

By putting the RAM in writing, any mistakes or problems can be identified.

Moreover, the participants in the project will have a better understanding of what their joint participation in the project is.

Role identification

In a RAM the role of the individual and the role of the group are not separated. The role describes the participation with accompanying tasks of the individual in the project.

Such a role can be performed by several people in a group.

Vice versa, one person may have several roles in the project. This is why several employees can have the role of project manager and one individual may have the role of manager and task performer.

Responsibility Assignment Matrix template

Start visualizing what the tasks and responsibilities are of each team member with this ready to use RAM template.

Download the Responsibility Assignment Matrix template

Join the Toolshero community

It’s Your Turn

What do you think? Is the Responsibility Assignment Matrix in today’s modern project- and stakeholder management? Do you recognize the practical explanation or do you have more additions? What are your success factors for good stakeholder management during a project?

Share your experience and knowledge in the comments box below.

More information

  • Project Management Institute (2010). A Guide to the Project Management Body of Knowledge ( PMBOK Guide) . PMI Standards Committee.
  • Baker, D. (2009). Multi-Company Project Management: Maximizing Business Results Through Strategic Collaboration . J Ross.
  • Cleland, D. and Ireland, L. (2006). Project management: strategic design and implementation . McGraw-Hill .

How to cite this article: Mulder, P. (2012). Responsibility Assignment Matrix (RAM) . Retrieved [insert date] from Toolshero: https://www.toolshero.com/project-management/responsibility-assignment-matrix/

Original publication date:: 03/26/2012 | Last update: 06/28/2024

Add a link to this page on your website: <a href=”https://www.toolshero.com/project-management/responsibility-assignment-matrix/”>Toolshero: Responsibility Assignment Matrix (RAM)</a>

Did you find this article interesting?

Your rating is more than welcome or share this article via Social media!

Average rating 4.3 / 5. Vote count: 4

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

Patty Mulder

Patty Mulder

Patty Mulder is an Dutch expert on Management Skills, Personal Effectiveness and Business Communication. She is also a Content writer, Business Coach and Company Trainer and lives in the Netherlands (Europe). Note: all her articles are written in Dutch and we translated her articles to English!

Related ARTICLES

Critical Chain Project Management - Toolshero

Critical Chain Project Management (CCPM) method

Gantt chart - Toolshero

Gantt Chart explained plus template

prince2 prince ii project management toolshero

Prince2 Methodology: Phases and Principles

Project Scope Control - toolshero

Scope Control for effective Project Management

WBS Work Breakdown Structure - toolshero

Work Breakdown Structure (WBS): Basics and Template

Request for Quotation template - Toolshero

Request for Quotation (RFQ): Basics and Template

Also interesting.

Rose of Leary - Toolshero

Rose of Leary model explained including a Test

Five functions of management - Toolshero

Five Functions of Management by Henri Fayol

gemba walk toolshero

Gemba Walk: definition, tips and checklist template

Leave a reply cancel reply.

You must be logged in to post a comment.

BOOST YOUR SKILLS

Toolshero supports people worldwide ( 10+ million visitors from 100+ countries ) to empower themselves through an easily accessible and high-quality learning platform for personal and professional development.

By making access to scientific knowledge simple and affordable, self-development becomes attainable for everyone, including you! Join our learning platform and boost your skills with Toolshero.

types of assignment matrix

POPULAR TOPICS

  • Change Management
  • Marketing Theories
  • Problem Solving Theories
  • Psychology Theories

ABOUT TOOLSHERO

  • Free Toolshero e-book
  • Memberships & Pricing

Organizational Structure

What is a Responsibility Assignment Matrix

Last updated: Feb 15, 2023

Table of contents

What is a RAM matrix used for?

How to make a ram or raci chart.

Learn what a Responsibility Assignment Matrix is and how to use one to make all your upcoming projects run smoothly.

Credit: track5/Getty Images

A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment.

It’s known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  • Responsible: Who is the person responsible for completing a task or making a decision?
  • Accountable: Who is accountable for the completion of the project overall and will sign off on deliverables and decisions?
  • Consulted: Who needs to be consulted to provide input on a particular task or item?
  • Informed: Who needs to be kept informed of project progress or completion?

A typical RAM template looks like this:

| Task | Annabelle (PM) | Jack (Technical Lead) | Dory (Technical Team Member) | | ---------- | ---------- | ---------- | ---------- | | Task 1 | A | I | R | | Task 2 | R | C | I | | Task 3 | C | R | C | | Task 4 | A | R/I | R |

The RAM matrix is used to document every task, item and decision involved in a project completion process. By keeping everything logged all in one place, a RAM matrix is an invaluable tool to any project manager or company leader for a few reasons.

  • Defines clear roles and responsibilities

There is nothing worse than a project being slowed down or stalled because of confusion over who was supposed to do what. In a RAM, every person or team involved can check to see which task or item.

  • Streamlines communication

Sometimes explaining directions in person or over a workplace communication tool can get confusing or be interpreted the wrong way. Even worse, one instance of miscommunication can tank an entire project or jeopardize a relationship with a client.

With a RAM, project managers don’t have to waste time directing questions to the responsible stakeholder in charge of making a decision. The chart informs everyone involved exactly who they can go to for answers, cutting out repetitive conversations and notifying the right people at the right time.

  • Distributes workloads evenly

No one ever wants to be the one in the group project that has to do everything. Team members with a higher workload are at a greater risk for burnout. A great benefit of a RAM is that everyone can see how the workload for a certain project is distributed. It’s also a great way to be transparent within workflows.

Don’t let the random letters confuse you. Building a RACI chart is surprisingly simple. It can also easily be tweaked to fit your organization and your particular project. According to the work management platform Wrike , here are four steps to follow when building a responsibility assignment matrix:

  • Identify all project roles

Start out with a list of everyone involved in a project, including every team, team member, manager and stakeholder.

  • Identify all project tasks

Then make a list of all the tasks and items needed to get a project done. These can include deliverables, activities, milestones and decisions.

  • Create a chart with a column for each role and a row for each task

In a spreadsheet—or any other tool you’d like—create a simple table by listing each person or role in the columns and each task or deliverable in the rows.

To get the most out of your RACI chart, try to make the roles as personal as possible. For example, instead of naming a role “technical lead,” try to use names, like “Jack.” This will give every person involved a sense of ownership, while also streamlining communication even further.

  • Assign “R,” “A,” “C” or “I” to each person involved

Once you have written out the names of each person and task, now comes the important part of assigning RACI to each person involved. Identify who is responsible, who is accountable, who needs to be consulted and who needs to be informed for every task in the project. A role can have more than one letter, but simplify it as much as you can. Bonus step: Add a color to each letter to make the roles stand out even more.

That’s it! You now have made a successful RACI chart. Review with your team and all stakeholders before you initiate a plan, and you are officially on your way to more effective project management.

Create your own free org chart today!

Show off your great team with a public org chart. Build a culture of recognition, get more exposure, attract new customers, and highlight existing talent to attract more great talent. Click here to get started for free today.

types of assignment matrix

The ORG helps you hire great candidates

Free to use – try today

The Best Organizational Chart Software of 2024

19 min read

What is an Org Chart?

Which org structure fits you, matrix organizational structure.

  • Artificial Intelligence
  • Generative AI
  • Business Operations
  • Cloud Computing
  • Data Center
  • Data Management
  • Emerging Technology
  • Enterprise Applications
  • IT Leadership
  • Digital Transformation
  • IT Strategy
  • IT Management
  • Diversity and Inclusion
  • IT Operations
  • Project Management
  • Software Development
  • Vendors and Providers
  • Enterprise Buyer’s Guides
  • United States
  • Middle East
  • España (Spain)
  • Italia (Italy)
  • Netherlands
  • United Kingdom
  • New Zealand
  • Data Analytics & AI
  • Newsletters
  • Foundry Careers
  • Terms of Service
  • Privacy Policy
  • Cookie Policy
  • Copyright Notice
  • Member Preferences
  • About AdChoices
  • Your California Privacy Rights

Our Network

  • Computerworld
  • Network World

The RACI matrix: Your blueprint for project success

A raci matrix is a simple, effective means for defining project roles and responsibilities, providing a comprehensive chart of who is responsible, accountable, consulted, and informed every step of the way..

project management meeting raci

Having managed and rescued dozens of projects, and helped others do so, I’ve noted that there is always one critical success factor (CSF) that has either been effectively addressed or missed/messed up: clarity around the roles and responsibilities for each project participant and key stakeholder. No matter how detailed and complete a project plan may be for any project, confusion or omission of participant roles and responsibilities will cause major problems.

Enter the RACI matrix. The simplest and most effective approach I’ve seen and used to define and document project roles and responsibilities is the RACI model. Integrating the RACI model into an organization’s project life cycle (PLC) creates a powerful synergy that enhances and improves project outcomes.

What is a RACI matrix?

The RACI matrix is a project role and responsibility assignment chart that diagrams every task, milestone, or key decision to assign team roles across four categories: Responsible , Accountable , Consulted , and Informed . These categories indicate whether a team member is Responsible for an action item, is Accountable for it, should be Consulted on it, or simply be Informed of the action, milestone, or decision. The acronym RACI stands for the four roles that stakeholders might play at any point in a project.

In almost 100 percent of my project rescue efforts, I have found that there is no shared understanding of participant roles and responsibilities, nor is there explicit documentation to support it. Establishing such a consensus by employing the RACI model almost always gets a stuck project moving again, and enables the key stakeholders to readily deal with the other issues that require resolution.

[ Learn why IT projects still fail at an alarming rate, beware the 12 project management myths to avoid , and find out how to pick the right project management methodology for your team . | Get the latest project management advice by signing up for our CIO newsletters . ]

RACI matrix roles

The RACI model brings structure and clarity to describing the roles that stakeholders play within a project . The RACI matrix clarifies responsibilities and ensures that everything the project needs done is assigned someone to do it.

The four roles that stakeholders might play in any project include the following:

  • Responsible : People or stakeholders who do the work. They must complete the task or objective or make the decision. Several people can be jointly Responsible .
  • Accountable : Person or stakeholder who is the “owner” of the work. He or she must sign off or approve when the task, objective or decision is complete. This person must make sure that responsibilities are assigned in the matrix for all related activities. Success requires that there is only one person Accountable , which means that “the buck stops there.”
  • Consulted : People or stakeholders who need to give input before the work can be done and signed-off on. These people are “in the loop” and active participants.
  • Informed : People or stakeholders who need to be kept “in the picture.” They need updates on progress or decisions, but they do not need to be formally consulted, nor do they contribute directly to the task or decision.

How to create a RACI matrix

The simple process for creating a RACI model includes the following six steps:

  • Identify all the tasks involved in delivering the project and list them on the left-hand side of the chart in completion order. For IT projects, this is most effectively addressed by incorporating the PLC steps and deliverables. (This is illustrated in the example below.)
  • Identify all the project stakeholders and list them along the top of the chart.
  • Complete the cells of the model identifying who has responsibility, accountability and who will be consulted and informed for each task.
  • Ensure every task has at least one stakeholder Responsible for it.
  • No tasks should have more than one stakeholder Accountable . Resolve any conflicts where there is more than one for a particular task.
  • Share, discuss and agree the RACI model with your stakeholders at the start of the project. This includes resolving any conflicts or ambiguities.

RACI matrix example

For purposes of simplification, let’s say your project can be broken down into four discrete tasks, undertaken by a team of application developers, along with a sponsoring project executive, project manager , business analyst , and technical architect.

Step 1 of the process involves mapping out the project as a whole. For this, the project manager is both accountable and responsible for the work at hand. To determine the scope and deliverables of the project , the project manager consults with the project’s executive sponsor and with the business analyst about the process to be overhauled as part of the project. The technical architect and the application developers are subsequently informed of the project plan.

In Step 2, the business analyst must then delve more deeply into the process to help map out each facet of the business process to be overhauled. The business analyst is thus responsible for the task, with the project executive being accountable for signing off on this work. To better understand the technical underpinnings of the current process, the business analyst will consult with the technical architect. The project manager and application developers will then be informed of the conclusions derived from this portion of the project.

Here is an illustration of a simplified RACI model for this example project, taking these first two steps into account:

simplified raci matrix model chart cio

The subsequent third and fourth tasks involve shaping the new process, again with the business analyst responsible for this work, and the other roles on the team following their same responsibilities when the old process was being analyzed in Step 2. Step 4 sees the technical architect taking over, devising a new architecture that will support the new process, signed off by the executive sponsor, and held accountable by the project manager, who devised the scope and deliverables in Step 1.

RACI matrix template

Templates are available for free on the web for those looking to get started with the RACI model. These are typically geared toward Microsoft Excel or Google Sheets, but can also be available for more specialized software. Here are several popular possibilities:

  • Vertex 42 Excel RACI templates
  • Projectmanager.com Excel RACI templates
  • Smartsheet Excel RACI templates
  • ClickUp RACI templates
  • Excel Downloads RACI templates

RACI vs. RASCI

RASCI is another type of responsibility assignment matrix used in project management. It retains the four core roles of RACI — Responsible , Accountable , Consulted , and Informed — but adds a fifth: Supportive . The Supportive role in a RASCI chart is responsible for providing assistance to those in the Responsible role. This may involve providing additional resources, expertise, or advice to help the Responsible party complete a particular task. Organizations that choose RASCI often do so to ensure that personnel who may not have direct responsibility or accountability but are nevertheless vital to the success of an activity or project are considered a notable facet (and cost) of the project. Individuals or entities that consult on a particular phase of a project, whether internal or external to the organization, provide an example of Supportive resources.

RACI matrix rules and best practices

Simply creating a RACI matrix is not enough. You must ensure that the matrix maps to a successful strategy. Here, certain rules should be followed, and conflicts and ambiguities in the plan must be hammered out.

When building out your RACI matrix, the following three rules should be applied:

  • Every task must have at least one Responsible party.
  • To ensure clear decision-making, each task should have only one Accountable person.
  • Every team member should have a role on each task, even if it is just to be Informed.

Resolving conflicts and ambiguities in a RACI matrix involves looking across each row and up and down each column for the following:

Analysis for each stakeholder:

  • Are there too many R’s : Does one stakeholder have too much of the project assigned to them?
  • No empty cells : Does the stakeholder need to be involved in so many of the activities? Can Responsible be changed to Consulted , or Consulted changed to Informed ? I.e., are there too many “cooks in this kitchen” to keep things moving? (And if so, what does that say about the culture within which this project is being managed?)
  • Buy-in : Does each stakeholder totally agree with the role that they are specified to play in this version of the model? When such agreement is achieved, that should be included in the project’s charter and documentation.

Analysis for each PLC step or deliverable:

  • No R’s : Who is doing the work in this step and getting things done? Whose role is it to take the initiative?
  • Too many R’s : Is this another sign of too many “cooks in this kitchen” to keep things moving?
  • No A’s : Who is Accountable ? There must be one ‘A’ for every step of the PLC. One stakeholder must be Accountable for the thing happening — “the buck stops” with this person.
  • More than one A : Is there confusion on decision rights? Stakeholders with accountability have the final say on how the work should be done and how conflicts are resolved. Multiple A’s invite slow and contentious decision-making.
  • Every box filled in : Do all the stakeholders really need to be involved? Are there justifiable benefits in involving all the stakeholders, or is this just covering all the bases?
  • A lot of C’s : Do all the stakeholders need to be routinely Consulted , or can they be kept Informed and raise exceptional circumstances if they feel they need to be Consulted ? Too many C’s in the loop really slows down the project.
  • Are all true stakeholders included in this model : Sometimes this is more of a challenge to ensure, as it’s an error of omission. This is often best addressed by a steering committee or management team.

RACI matrix in project management

It is the above analyses, which are readily enabled by the use of a RACI matrix, that deliver the real benefit of the model. It is the integration of the model with a specific PLC that ensures that the project is structured for success. Without either component, problems with the structure of the project management process may remain hidden until (or even while…) they cause the project to bog down. Making the time and effort to create a customized PLC/RACI for each significant project is an opportunity to design your project management process for project success.

More on project management:

  • Project management guide: Tips, strategies, best practices
  • What is a project manager? The lead role for project success
  • 5 early warning signs of project failure
  • 12 project management myths to avoid
  • 16 tips for a smooth switch to agile project management

Related content

Cios listen up: either plan to manage fast-changing certificates, or fade away, the three-pronged transformation strategy driving innovation at ppg, 6 insights every cio should take away from the crowdstrike debacle, navigating the aftermath: strategic actions to restore customer experience and drive growth, from our editors straight to your inbox.

With more than 25 years of corporate leadership experience and 6 years of executive coaching expertise, Bob Kantor is the founder of Kantor Consulting Group . Through his company's executive coaching and leadership development programs, Bob supports IT and STEM professionals transitioning from managing technology to leading people with innovation and confidence.

It’s rare for technology-driven organizations today to be limited by or constrained in what they can accomplish based on their technology skills. Rather, it’s the soft skills of those in leadership positions that typically create bottlenecks, miscommunication, re-work and ultimately, projects that are over budget and behind schedule. These are all areas where Bob’s programs enable clients to gain traction and get things turned around.

Bob has experience in leadership coaching for over 150 IT executives and managers at Bloomberg, and over 60 senior IT leaders at companies like DISH Network, Chevron, PayPal, eBay, Toyota, Aetna, Sysco, Unilever, SunTrust Bank, The Walt Disney Company and Molina Health Care.

The opinions expressed in this blog are those of Bob Kantor and do not necessarily represent those of IDG Communications, Inc., its parent, subsidiary or affiliated companies.

More from this author

Salesforce: latest news and insights, sap: latest news and insights, expanding the digital means to better health at procare, 360 degrees of digital innovation at waste management new zealand, delta airlines to ‘rethink microsoft’ in wake of crowdstrike outage, crowdstrike failure: what you need to know, servicenow: latest news and insights, the customers and communities that drive beyond bank’s tech strategy, show me more, at klarna, ai is helping reduce payroll in a big way.

Image

IBM Z mainframes get AI boost with new Telum II processor, Spyre accelerator

Image

How not to hire a North Korean IT spy

Image

CIO Leadership Live Australia with Nazih Battal, Chief Information and Technology Officer at Rashays

Image

Mike Aiello, CTO at Secureworks, joins CIO Leadership Live from Foundry's CIO100 event NEW

Image

CIO Leadership Live Australia with Andrew Dome, Chief Digital Information Officer at Uniting

Image

Kubecost helps firms monitor, optimize their Kubernetes and cloud spend

Image

Mike Aiello, CTO at Secureworks, joins CIO Leadership Live from Foundry's CIO100 event

Image

Sponsored Links

  • Everyone’s moving to the cloud. Are they realizing expected value?
  • Everybody's ready for AI except your data. Unlock the power of AI with Informatica
  • The cloud shouldn’t be complicated. Unlock its potential with SAS.
  • The future of identity is here. Unlock brand growth with Merkury

language-selector

  • 1.  Project Management Basics
  • 2.  Project Management Methodologies
  • 3.  Project Management Life Cycle
  • 4.  Best Project Management Software
  • 5.  Team Collaboration Tips
  • 6.  Agile Methodology Basics
  • 7.  Agile Project Management Tools & Techniques
  • 8.  Project Management Frameworks
  • 9.  Resources
  • 10.  Glossary
  • Advanced Terminology
  • Methodologies
  • PM Software Features
  • Basic Terminology
  • Professional Development
  • Agile Project Management
  • Project Management Guide

What is a Responsibility Assignment Matrix (RAM) in Project Management?

Artem Gurnov

Introduction to Responsibility Assignment Matrix (RAM)

Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. 

One tool that can help project managers achieve this goal is the Responsibility Assignment Matrix (RAM). In this article, we will explore the definition and benefits of RAM, as well as some examples.

If you’re looking for a RAM template that will help you assign roles and clarify responsibilities, Wrike has a customizable template ready to go.

What is a Responsibility Assignment Matrix (RAM) in project management?

A responsibility assignment matrix (RAM) in project management, also known as a RACI chart or RACI matrix, details all the necessary stakeholders and clarifies responsibilities amongst cross-functional teams and their involvement level in a project. RACI stands for Responsible, Accountable, Consulted, and Informed and each letter corresponds to a team member.

A RAM in project management should be referred to by all parties throughout a project because it helps plan an individual’s roles and responsibilities before work begins. A RACI matrix ensures all stakeholders know who is responsible for completing a task or getting feedback on deliverables.

The four roles are broken down as follows:

  • Responsible: The person(s) completing the task
  • Accountable: The team member coordinating the actions, making decisions, and delegating to those responsible for the task
  • Consulted: The person(s) who will be communicated with regarding decisions and tasks
  • Informed: The person(s) who will be updated during the project and upon completion

Read more about RACI here . 

Identify and visualize roles seamlessly with Wrike

Responsibility assignment matrix example.

A common RAM   template looks like the example below. Notice how all stakeholders can have more than one role:

types of assignment matrix

Responsibility Assignment Matrix template

Below you can see a powerful RAM template . The chart helps with visualizing roles and workload clearly. Therefore, project managers and team members follow the progress easily and stay on track.

types of assignment matrix

Clarify roles with Wrike

In conclusion, RAM is a useful tool for any project manager who wants to ensure their team is clear on their responsibilities. It helps to establish a structured approach to project management, allowing for better communication, accountability, and ultimately, project success.

Using Wrike’s pre-built template, you can define the roles of each team member so everybody is on the same page. The template will also help you balance your workload and create complete transparency on your team structure.

What is a RACI Chart?

types of assignment matrix

Artem Gurnov

Artem is a Director of Account Development at Wrike. He previously held the role of Project Manager, overseeing a team of customer success managers (CSMs). Over the years of building teams and scaling business processes, he has successfully deployed multiple projects, from automating client outreach to setting up work prioritization tools for sales reps and CSMs.

Basic Project Management

  • Project Charter
  • Project Management Stakeholders
  • What is a Project?
  • Work Breakdown Structure
  • Project Objectives
  • Project Baseline
  • Project Management Scheduling
  • Project Management Work Packages
  • Project Management Scope
  • Scope Creep

Advanced Project Management

  • What is PERT?
  • Network Diagram
  • Risk Management
  • Cost Estimation
  • Feasibility Study
  • Monte Carlo Analysis
  • Project Integration
  • Cost Management
  • PMI Project Management
  • What To Do With Certification
  • Certification
  • Become Certified
  • PMP Certification
  • Best Certification

Software Features

  • Critical Success Factors
  • Capacity Planning
  • User Role Access Permissions
  • Time Tracking
  • Budget Tracking
  • Request Forms
  • Work Assignments
  • Version Control
  • Dependency Managements
  • Project management Milestones
  • Project Management Software
  • Project Management Tools
  • Project Management System
  • Gantt Charts

loading

types of assignment matrix

Creating a RACI matrix: define your team’s roles and responsibilities

types of assignment matrix

How to create and use a RACI Matrix

Working on a complex project can be rewarding, stimulating, and, if we’re honest, frustrating. There are numerous elements that could grind a project manager’s gears, from delays to cost overruns . But there is little more frustrating than realizing too late that a member of the team had no idea they were accountable for a key component of the project.

No matter how talented and experienced your people are or how in-depth your project plan is, mistakes will happen if your team aren’t clear about their responsibilities. Being transparent about who needs to be involved and to what extent on every project task may feel overwhelming. Luckily, there’s a simple way to lay out this information and avoid mistakes due to unclear assignments.

Let’s discuss the RACI matrix and how you can create one to define your team’s roles and responsibilities.

What is a RACI matrix?

A RACI matrix, or RACI chart , is a type of responsibility assignment matrix that’s about making responsibilities clear. In simple terms, it’s a diagram that lists the tasks that make up a project and who is responsible for each task.

RACI stands for the four different levels of involvement someone may have in a task, Responsible, Accountable, Consulted, and Informed. The ‘tasks’ listed can cover anything from a major milestone to a decision.

The function of a RACI matrix is to limit confusion about who should be responsible for what. That means less finger-pointing, avoidance tactics, and miscommunication when a difficult call needs to be made or an error needs addressing.

Is using a RACI matrix right for my project?

Using a RACI matrix will benefit most projects. However, there are specific scenarios where it’ll work best, such as for projects with a huge number of moving parts. If your project requires the team to work on multiple larger tasks at the same time or involves more than one external team, a RACI matrix will help keep you keep on top of everything.

Equally, that means there are certain projects where a RACI matrix may not be suitable. For example, if a project is relatively simple and responsibilities can be communicated clearly through the team using traditional methods, setting up a RACI matrix might not be worth it. Weigh up the effort of creating a RACI matrix against the benefits it could offer your team and project to see if it’s worthwhile.

RACI matrixes are popular in project management but can also be used for software development, business analytics, construction, and website development, among other disciplines.

A RACI matrix can be useful if:

  • The team are known to forget their responsibilities
  • There is a culture of finger-pointing
  • Workload ends up being unevenly distributed throughout the team
  • There is high turnover in the team
  • Approvals need to be made quickly and efficiently

A RACI matrix may not be helpful if:

  • The project is small
  • The same team members retain the same level of responsibility across all tasks
  • The team is known for its effective communication and healthy approach to collaboration

How to create a RACI matrix for project management

Now that we know what a RACI matrix is and what it is helpful for (and not helpful for) let’s delve into how to create one. This will help you better manage your team as a project manager.

Understand the definitions

The first step is to understand what RACI means. As mentioned, this stands for Responsible, Accountable, Consulted, and Informed. Let’s go over what each means.

  • Responsible : This team member is responsible for doing the work needed to complete the task. This assignment is task-oriented and can relate to a whole team. There has to be at least one responsible person assigned to each task.
  • Accountable : This team member takes charge of delegating work and has the final say over whether a task has been completed successfully or not. This assignment is focused on the outcome. There should only be one Accountable person for each task.
  • Consulted : There may be multiple Consulted individuals assigned to a task, depending on its complexity. These people offer unique insights based on expertise and provide feedback on the task based on this and how it’ll impact their future work.
  • Informed : Informed team members need to be kept up-to-date on progress relating to the specific task, but they aren’t directly involved. They may be a client or executive.

As you may have realized, some assignments will overlap. For example, the person Responsible for completing the task may also be Accountable.

List the deliverables

Now, let's go over how to set your RACI chart up. The easiest way to do this is using an Excel spreadsheet or similar. 

Start by writing ‘Task’ in cell A1. Then, input the list of tasks that need to be completed in your project below the title in column A. This can include individual tasks, deliverables, milestones, and decisions.

If you like to organize your tasks by category or project phase, you can add headers for each section to divide these up. How you approach this will be dependent on your style of organization and existing project plan.

Add your team members

Starting from cell B1, list the project roles that make up your team in the cells along row 1. You can include your team members’ names if this is going to be helpful. You may also need to include external stakeholders or suppliers if they will be involved, including those who will be assigned as Informed.

Assign the RACI values

The final step is to assign a RACI value to each person against each task. Go through the sheet line by line and populate your matrix based on the definitions above. 

You can even create a separate tab that details the definitions of each role. This can then be used to create a simple drop-down using ‘ data validation ’ if you find this easier than typing in each letter. It can also help avoid errors or typos.

Here’s an example of what your RACI matrix could look like:

Assign the RACI values

Now that you can see it laid out, it becomes clear why a RACI matrix is helpful in keeping track of responsibilities and tasks.

Inform your team

RACI matrixes work best when they’re created collaboratively. Instead of simply assigning responsibilities and expecting your team to fall into line, inform them of your decisions and give them an opportunity to give feedback before finalizing your chart.

Remember the rules and best practices

When you begin using a new, unfamiliar tool, it's best to start out by abiding by its rules and best practices.

Best practices:

  • Make sure everyone has been made aware of the decisions you’ve made about their responsibilities before the RACI matrix is approved.
  • Don’t add meetings, reports, or repetitive to-dos to the matrix; instead, focus on tasks, milestones, and important decisions that drive the project forward.
  • Make sure the task names are recognizable when compared with your project plan. This will help you track progress and pull up details quickly.

RACI rules:

  • Don’t forget to assign at least one Responsible person to each task
  • Don’t be tempted to assign more than one Accountable person. Doing so will confuse matters further!
  • Dole out Responsible assignments carefully so no one person is overwhelmed by tasks.
  • Involve every member of your team in every task, even if that means a few individuals are informed on multiple tasks.

The benefits of using a RACI matrix

If you’re not already convinced of the merits of creating a RACI matrix for your current project, let’s review some of the top benefits.

Clarified roles

Clearly delegating roles is fundamental to running a successful project. Even the tightest-knit teams can have slips in communication, and even the most organized individuals can forget a task on their to-do list. 

A RACI matrix makes it clear in no uncertain terms what needs to be done and the role that each person plays in each of those tasks. WIth inflexible definitions supplied for the four assigned roles, there is little room for misinterpretation.

Smooth handovers

When a key team member leaves and a new starter needs to be onboarded, mistakes can occur. With a RACI chart in place, it’s clear what responsibilities a leaver’s replacement needs to be picked up — including what is urgent — even if they’ve forgotten to add it to their handover. A RACI chart can even come in handy when workload needs to be reassigned during paid time off.

Ensures all eventualities are covered

As a project commences, it can be easy to get caught in the weeds. By setting your RACI chart up early, you protect yourself from tasks or decisions being forgotten along the way.

Optimized communication

Having a RACI chart available for all team members to refer to makes it clear when stakeholders need to be informed of updates so they aren’t left out of the loop unintentionally.

Alternatives to RACI charts

There are several alternative ways to approach responsibility assignments. If a RACI chart isn’t the right fit for you, you may be interested in trying out one of these alternatives.

  • DACI chart: Standing for Driver, Approver, Contributor, and Informed, a DACI chart seeks to make decision-making roles clear.
  • RAPID: Standing for Recommend, Agree, Perform, Input, Decide, a RAPID responsibility matrix is useful in clarifying authority versus accountability, with the Recommend role taking charge of driving the project forward and the Decide role having ultimate responsibility for decision-making.
  • RASCI matrix: This final alternative adds a fifth role to the RACI mix. The Supportive role isn’t responsible for any outcomes, instead acting as a support to the Responsible individual.

Run smoother projects with Forecast

Making the roles and responsibilities in your team clearer is critical to project success, but it is only one part of the puzzle. Forecast offers a whole host of tools, from auto-generating reports to detailed project plans, that make the life of a project manager or scrum master easier.

Try Forecast out for yourself by signing up for a free trial below.

AI for Project, Resource & Capacity Planning

Take your project and resource management to the next level with our AI-driven platform.

Related Articles

Browse topics, related content.

types of assignment matrix

How to Crush eCommerce Project Management

types of assignment matrix

Project Initiation: How to Get Your Project Off to a Flying Start

types of assignment matrix

What Does Estimation Mean for Your Project?

Get started now with forecast.

The ultimate upgrade to delivering projects on time and on budget.

  • Integrated AI
  • Resource Allocations
  • Revenue Recognition
  • Story Points
  • Custom User Roles
  • Time Tracking
  • Gantt Charts
  • Project Milestones
  • Product Portfolio View
  • Project Scoping
  • Project Baselines
  • Notifications
  • Reporting & Analytics
  • Utilization Reports
  • Agile Development
  • Capacity Planning
  • Digital Agencies
  • Digital Project Management
  • Financial Management
  • Professional Services Automation
  • Resource Forecasting
  • Resource Management
  • Sprint Planning
  • Task Management
  • All integrations
  • Success Stories
  • Developer API
  • Cookie Policy
  • Privacy Policy

types of assignment matrix

PMP Certification & Project Management Training Courses

The Responsibility Assignment Matrix - RAM

Yad Senapathy

Published: December 21, 2022

Updated: June 11, 2024

The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and responsibilities within a project team and avoids confusion or overlap. Besides these things, the Responsibility Assignment Matrix also helps improve communication and coordination within the team, leading to a more successful project outcome.

What is RAM in project management?

A RAM consists of a grid with four columns: responsible, accountable, consulted, and informed also known as a RACI chart. Each row on the grid represents a specific task or activity within the project, and each column represents a role or responsibility. To help you understand these four columns, we have explained them below.

Responsible

This column represents the person or team responsible for completing the task. They are the ones who will do the work.

Accountable

This column represents the person or team ultimately accountable for completing the task. They may not be doing the work themselves, but they are responsible for ensuring it gets done.

This column represents the people or teams who need to be consulted or informed about the task before it is completed. They may have input or expertise that can help in completing the task effectively.

This column represents the people or teams who need to be informed about the task once it is completed. They may not have direct involvement in the task, but they need to be kept in the loop for various reasons.

Things to Consider When Creating a RAM or a RACI chart

If you’re creating a RAM, here are a few key considerations to keep in mind.

  • Ensure the roles and responsibilities are clearly defined: It is vital that everyone on the team understands their specific duties and how they fit into the project plan. If there is any confusion or uncertainty, it can lead to delays or mistakes.
  • Ensure accountability: The person or team in the accountable column should be identified, as they are ultimately responsible for ensuring that the task is completed successfully.
  • Be mindful of overlap: Avoiding overlap or duplication of responsibilities within the team is important. If multiple people or teams are responsible for the same task, it can lead to confusion and potentially create unnecessary bottlenecks.
  • Use it as a living document: A RAM is not a static document, as it should be updated with the change in roles and responsibilities and the progress made in the project. Make sure to regularly review and revise the RAM as needed to reflect the project’s current state accurately.

Example of Responsibility Assignment Matrix (RAM)

Following is an example of a responsibility assignment matrix for a new product launch project.

Task Responsible Accountable Consulted Informed
Conduct market research Marketing team Product manager Sales team Executive team
Design product packaging Design team Product manager Marketing team Executive team
Source materials for production Procurement team Product manager Design team Executive team
Set up production line Operations team Product manager Procurement team Executive team
Create marketing campaign Marketing team Product manager Sales team Executive team

In this example, the product manager is the one who is ultimately accountable for the success of the project, while the various teams are responsible for completing specific tasks. The marketing, design, procurement, and operations teams are all responsible for their respective tasks, and they are also consulted or informed as needed by other teams. The executive team is kept informed of the project’s progress.

To sum it up, the responsibility assignment matrix RAM also known as a RACI chart is a valuable tool for any project manager to have in their toolkit. It helps to clearly define roles and responsibilities within a team, which ultimately leads to a more successful outcome for any project.

yad senapathy

Yad is not just the leader of the Project Management Training Institute (PMTI). He helped to write significant portions of the project management standards worldwide. He is helping PMI right now in reviewing, directing, and leading the development of the 7th edition of the PMBOK ® Guide to incorporate the most monumental changes to project management standards in 35 years. He shares his wisdom with readers via the PMTI blog.

PMP Course Locations

East coast pmp courses.

  • Washington DC
  • Tysons Corner, VA
  • Fairfax, VA
  • Alexandria, VA
  • Manassas, VA
  • Columbia, MD
  • Baltimore, MD
  • Rockville, MD
  • Richmond, VA
  • New York, NY
  • Parsippany, NJ
  • Princeton, NJ
  • Philadelphia, PA
  • Pittsburgh, PA
  • Hartford, CT

South East PMP Courses

  • Atlanta, GA
  • Huntsville, AL
  • Charlotte, NC
  • Raleigh, NC
  • Charleston, SC
  • Orlando, FL
  • Jacksonville, FL
  • Fort Lauderdale, FL

Mid West PMP Courses

  • Detroit, MI
  • Chicago, IL
  • Madison, WI
  • Milwaukee, WI
  • Minneapolis, MN
  • St. Louis, MO
  • Columbus, OH
  • Cincinnati, OH
  • Cleveland, OH
  • Kansas City, MO
  • Indianapolis, IN
  • Louisville, KY

South West & West Coast PMP Courses

  • Houston, TX
  • Albuquerque, NM
  • Phoenix, AZ
  • San Antonio, TX
  • Anaheim, CA
  • Los Angeles, CA
  • San Jose, CA
  • Sacramento, CA
  • San Diego, CA
  • San Francisco, CA
  • Portland, OR
  • Seattle, WA

This website uses 3rd party cookies to ensure you get the best experience on our website.

PM for the Masses

This is a placeholder for your sticky navigation bar. It should not be visible.

The Responsibility Assignment Matrix (RAM)

A Responsibility Assignment Matrix (RAM), also known as RACI matrix or Linear Responsibility Chart (LRC), describes the participation by various roles in completing tasks or deliverables for a project or business process. It is especially useful in clarifying roles and responsibilities in cross-functional/departmental projects and processes. RACI is an acronym derived from the four key responsibilities most typically used:

* Responsible: Those who do the work to achieve the task. There is typically one role with a participation type of Responsible, although others can be delegated to assist in the work required.

* Accountable (also Approver or final Approving authority): The one ultimately accountable for the correct and thorough completion of the deliverable or task, and the one to whom Responsible is accountable. In other words, an Accountable must sign off (Approve) on work that Responsible provides. There must be only one Accountable specified for each task or deliverable

* Consulted: Those whose opinions are sought; and with whom there is two-way communication.

* Informed: Those who are kept up-to-date on progress, often only on completion of the task or deliverable; and with whom there is just one-way communication.

Very often the role that is Accountable for a task or deliverable may also be Responsible for completing it (indicated on the matrix by the task or deliverable having a role Accountable for it, but no role Responsible for its completion, i.e. it is implied). Outside of this exception, it is generally recommended that each role in the project or process for each task receive, at most, just one of the participation types. Where more than one participation type is shown, this generally implies that participation has not yet been fully resolved, which can impede the value of this technique in clarifying the participation of each role on each task. There is a distinction between a role and individually identified people: a role is a descriptor of an associated set of tasks; may be performed by many people; and one person can perform many roles. For example, an organization may have 10 people who can perform the role of project manager, although traditionally each project only has one project manager at any one time; and a person who is able to perform the role of project manager may also be able to perform the role of business analyst and tester.

The PMBOK Guide 4th Edition (starting in section 9.1) defines RACI as a responsibility assignment matrix (RAM) which is used to illustrate the connections between work packagers or activities and project team members. On larger projects, RAMs can be developed at various levels. For example, a high-level RAM can define what a project team group of unit is responsible for within each component of the WBS, lower level RAMs are used within the group to designate roles, responsibilities and levels of authority for specific activities. The matrix format shows all activities associated with one person and all people associated with one activity. This also ensures that there is only one person accountable for any one task to avoid confusion. The PMBOK confirms that one example of a RAM is the RACI chart, showing the work to be done in the left column as activities. The assigned resources can be shown as individual or groups. The RACI is just one tye of RAM; the project manager can select other options such as “lead” and “resource” designation or others as appropriate for the project. The RACI is particularly important when the team consists of internal and external resources to ensure clear divisions of roles and expectations.

  • Categories: Podcast

banner-in1

  • Project Management

Responsibility Assignment Matrix: Template, Example & Benefits

Home Blog Project Management Responsibility Assignment Matrix: Template, Example & Benefits

Play icon

Your team is the most crucial resource in completing a job. They must adhere to the project's schedule and budget. Controlling the project requires everyone involved to understand their roles and duties when carrying out tasks and accomplishing project objectives. How can all the participants in a project be coordinated so that they are aware of what they are doing and do not prevent others from carrying out their tasks? An assignment of responsibility matrix can be useful.

Your project will have a productive crew thanks to an assignment matrix. You can take an online PMP course to learn the details included in RAM, Responsibility Assignment Matrix in project management, and Responsibility Assignment Matrix example, to advance your career.

What is a Responsibility Assignment Matrix in Project Management?

So, what is the responsibility assignment matrix?  A Responsibility Assignment Matrix (RAM), sometimes referred to as a RACI chart or RACI matrix, in project management identifies all relevant stakeholders and specifies roles for cross-functional teams and their level of involvement in a project. Each letter in the acronym RACI, which stands for Responsible, Accountable, Consulted, and Informed, refers to a different team member in the Responsibility Assignment Matrix in Project Management.

1. Responsible

The team member that oversees finishing the assignment is the person responsible for the RAM, Responsibility Assignment Matrix. The person in charge may be tasked with gathering all the visual and data assets required to put together the presentation if your team is working on a pitch deck (Responsible for executing the task).

2. Accountable

The responsible team member distributes the tasks to the other team members and ensures that they are finished accurately and on time. This team member oversees making sure the project is completed on schedule and that the tasks are fairly distributed among the accountable parties (Has governing & directing authority).

3. Consulted

A responsible party in Responsibility Assignment Matrix Project Management may frequently need to consult an expert, who serves as the consulted person, to finish certain responsibilities. A professional analysis of the consulted party is required when someone is tasked with gathering marketing statistics for a presentation. They also need to ensure that the data the responsible party is required to submit is accurate (Provide insights, analysis or expert judgment).

4. Informed

The informed party needs to be aware of when the major project components are finished even though they may not be directly involved in all the steps to ensure that everything is running smoothly. The informed team member must be aware of any delays or stalls in the project as they must complete their tasks (Updated with project information and outcome).

Responsibility Assignment Matrix in Project Management

Responsibility Assignment Matrix (RAM) Goal in Project Management

The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises. It might also be applied within a working group to establish authority levels, roles, and duties for tasks.

The matrix format displays each person's associated actions and each person's associated people. To avoid confusion, this makes sure that there is only one person responsible for each task. It is also important to outline the dates and reminders for each participant, so that they are aware of their deliverables/plans to fulfill the deliverables. The best Project Management Certification programs online will teach you how to make efficient decisions and effectively use RAM.

How to Create a Responsibility Assignment Matrix?

A Responsibility Assignment Matrix (RAM) is a table that shows the tasks needed to be completed as part of a project, who is responsible for each task, and when the task needs to be completed. Making a matrix to distribute responsibilities is not as challenging as getting everyone on board with their respective jobs and responsibilities.

You should therefore involve your staff in the process, receive their feedback, and eventually secure their buy-in without expending excessive time and effort on it. You will have a successful responsibility assignment if you follow these instructions to ensure that everyone is on the same page. 

  • List every person involved in the project, including the team, stakeholders, and everyone in between.
  •  List each project deliverable that you can think of. To make sure you do not overlook any, use a work breakdown framework.  
  •  To discuss how to carry out the tasks and produce the deliverables, meet with the team members. The duty and authority of the team for each assignment must be discussed.
  •  Utilizing a table with the project tasks specified in the left-hand column, create a Responsibility Assignment Matrix. Print the names of everyone involved in the project across the top.
  • Assign whether a project team member is liable, accountable, consulted, or informed where the tasks meet them.  
  •  Share the completed Responsibility Assignment Matrix Template Word with the project team and stakeholders. If necessary, conduct a meeting to ensure that everyone is aware of their responsibilities for the project. Print a copy, and if you are working in a common location, post it.

Developing Responsibility Assignment Matrix (RAM) Best Practices

The best practices for developing a Responsibility Assignment Matrix (RAM) will vary depending on the specific project and organization. However, some tips on how to develop a RAM matrix effectively include the following:

  • Define the project scope and objectives clearly, so that all stakeholders understand the parameters of the project and what is expected to be accomplished.
  • Assign clear roles and responsibilities to individuals and teams so that everyone knows who is responsible for what aspect of the project.
  • Make sure that the Responsibility Assignment Matrix PMP is kept up to date as the project progresses so that everyone is aware of any changes in roles and responsibilities.
  • Use the RAM matrix as a tool to help identify potential risks and issues related to the project so that they can be addressed early on.
  • One stakeholder leads a task.
  • The lesser number of people are accountable, the better.
  • Act efficiently with meetings.
  • Continuous communication.
  • Stakeholder agreement on final RAM.

Responsibility Assignment Matrix Examples and Templates

  • Responsibility Assignment Matrix (RACI) 
  • RACI-VS (Responsible, Accountable, Consulted, Informed- “V”erification and “S”ign off)
  • RASCI (Responsible, Accountable, Support, Consulted, Informed)
  • RAC (Responsible, Accountable, Consulted)
  • ARCI (Accountable, Responsible, Consulted, Informed)
  • RATSI (Responsibility, Authority, Task, Support, Informed)
  • PACSI (Perform, Accountable, Control, Suggest, Informed)
  • RACIQ (Responsible, Accountable, Consulted, Informed, Quality Review)
  • DACI (Driver, Approver, Contributors, Informed)
  • CAIRO (Consulted, Accountable, Informed, Responsible, Omitted)

sample responsible assignment matrix - RACI

Downloadable Responsibility Assignment Matrix Template Excel

Download the Responsibility Assignment Matrix Template (xlsx) here!

This Responsibility Assignment Matrix template is available for free in both Excel and OpenDocument Spreadsheet formats. The template can be completely modified using Microsoft Excel and adjusted to meet the needs of your project. To make it simple to understand what is required of each worker on each task, the template employs conditional formatting to change the color of each cell.

Download a Printable Responsibility Assignment Matrix PDF

Download the Responsibility Assignment Matrix Template (PDF) here!

If you intend to design a Responsibility Assignment Matrix (RAM), you may require samples and templates to use as a guide, regardless of whether you are managing an event, a construction project, or a restaurant. Some of the templates are-

  • Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix for Construction Project Template
  • Basic Responsibility Assignment Matrix Sample
  • Responsibility Assignment Matrix in PDF

Benefits of Responsibility Assignment Matrix

There are many benefits of the Responsibility Assignment Matrix. One benefit is that it helps to ensure that everyone on a project team understands their roles and responsibilities. This can help to prevent misunderstandings and conflict between team members. Another benefit of using RAM is that it can help to improve communication between team members.

By clearly defining roles and responsibilities, team members will know whom to go to for specific information or tasks. This can help to avoid confusion and delays. Lastly, RAM can help to improve project management by providing a clear overview of who is responsible for what. This can help project managers to identify potential problems or areas where there may be a lack of resources.

Top Cities where Knowledgehut Conduct Project Management Certification Training Course Online










Unlock your potential as a Scrum Master with our game-changing certified scrum master course . Acquire the skills, knowledge, and confidence to effectively lead agile teams. Join us now and pave your way to success!

A Responsibility Assignment Matrix (RAM) is a tool used to identify and define the roles and responsibilities of individuals and groups within an organization. It is a means of clarifying who is responsible for what and ensuring that everyone understands their roles and responsibilities. RAM can be used to create accountability and ownership for tasks and projects, and to identify potential areas of conflict.

It is a valuable tool for effective project management and can help to ensure that everyone involved in a project is aware of their roles and responsibilities. It can also help to identify potential areas of conflict and ensure that tasks are properly assigned. The KnowledgeHut online PMP course will give you an insight into the Responsibility Assignment Matrix and can be a helpful tool for any project manager.

Frequently Asked Questions (FAQs)

1. what is included in a responsibility assignment matrix.

A Responsibility Assignment Matrix (RAM) is a tool used to help define and assign roles and responsibilities for a project or process. The matrix typically includes a list of tasks or deliverables and the people or groups responsible for each. 

2. What can a Responsibility Assignment Matrix (RAM) eliminate?

RAM eliminates ambiguity and confusion over who is responsible for what on a project. It also provides a clear overview of who is responsible for each task, making it easier to hold team members accountable.

3. What does a Responsibility Assignment Matrix not show?

The duty assignment matrix links resources to the tasks or work packages they must do, but it does not indicate when they will be required to do their work.

Profile

Kevin D.Davis

Kevin D. Davis is a seasoned and results-driven Program/Project Management Professional with a Master's Certificate in Advanced Project Management. With expertise in leading multi-million dollar projects, strategic planning, and sales operations, Kevin excels in maximizing solutions and building business cases. He possesses a deep understanding of methodologies such as PMBOK, Lean Six Sigma, and TQM to achieve business/technology alignment. With over 100 instructional training sessions and extensive experience as a PMP Exam Prep Instructor at KnowledgeHut, Kevin has a proven track record in project management training and consulting. His expertise has helped in driving successful project outcomes and fostering organizational growth.

Avail your free 1:1 mentorship session.

Something went wrong

Upcoming Project Management Batches & Dates

NameDateFeeKnow more

Course advisor icon

COMMENTS

  1. Responsibility assignment matrix

    In business and project management, a responsibility assignment matrix [1] (RAM), also known as RACI matrix [2] (/ ˈ r eɪ s i /) or linear responsibility chart [3] (LRC), is a model that describes the participation by various roles in completing tasks or deliverables [4] for a project or business process.RACI is an acronym derived from the four key responsibilities most typically used ...

  2. RACI Matrix: Responsibility Assignment Matrix Guide for 2024

    RACI is a project management acronym for the different responsibility types within a project: Responsible, Accountable, Consulted, and Informed. The RACI matrix clarifies the roles named individuals or groups will play in the successful delivery of the project. Accurate RACI matrices can help ensure a project's success before it even begins.

  3. What Is A Responsibility Assignment Matrix (RAM)? Everything You Need

    Getty. The responsibility assignment matrix (RAM) is a form of project management that encourages everyone to understand every step of the project. Looking at the chart involves all parties and ...

  4. RACI Chart: Definitions, Uses And Examples For Project ...

    A RACI chart, also called a RACI matrix, is a type of responsibility assignment matrix (RAM) in project management. In practice, it's a simple spreadsheet or table that lists all stakeholders on ...

  5. What Is a Responsibility Assignment Matrix (RAM) in Project Management?

    Key Takeaway: A Responsibility Assignment Matrix (RAM) is a useful tool for project managers to assign tasks and responsibilities to team members. It can help improve communication, increase accountability, track progress more accurately and reduce risk. There are two main types of RAMs: Functional (F-RAM) and Projectized (P-RAM), each with ...

  6. A Project Management Guide for Everything RACI

    The above four types of association of a role to a task represented in a simple task vs. role diagram or matrix is called RACI (pronounced 'racey') matrix. So basically the RACI matrix is a responsibility assignment matrix (RAM), designed to assign tasks, activities, responsibilities, accountability, decision making, support to team members ...

  7. What Is a RACI Chart? Practical Examples & Project Uses

    A RACI chart—also known as a responsibility assignment matrix—is a diagram used in project management to define team roles across 4 categories: Responsible, Accountable, Consulted, and Informed. It helps clarify who does the work, who calls the shots, whose opinion matters, and who needs to stay in the loop for each task, milestone, or ...

  8. How to Make a Responsibility Assignment Matrix ...

    Draft the responsibility assignment matrix using a table with the project tasks listed on the left-hand column. Across the top add the name of everyone in the project. Where the tasks meet the project team member, assign whether they're responsible, accountable, consulted or informed. When completed, share the responsibility assignment matrix ...

  9. A Definitive Guide to the RACI Chart

    A RACI Chart is a type of Responsibility Assignment Matrix (RAM) that shows the roles and tasks assigned to each team member visually. It identifies the roles and responsibilities of the individuals in tasks and projects. A glance at this chart can help you find out who is assigned to what in particular.

  10. RACI Charts

    A RACI chart (sometimes called a Responsibility Assignment Matrix) is a way to identify your project teams' roles and responsibilities for any task, milestone, or project deliverable. By following the RACI acronym, you can clarify responsibility and reduce confusion. RACI stands for: Responsible. This person is directly in charge of the work.

  11. What is the Responsibility Assignment Matrix (RACI Chart)?

    The RACI chart describes how the matrix assigns each task or deliverable, assigns an owner, and denotes who else is involved, ultimately classifying involved parties into four categories: responsible, accountable, consulted and informed. This approach is widespread among project managers, according to " A Guide to the Project Management Body ...

  12. Responsibility Assignment Matrix (RAM)

    6 Steps to Developing a Responsibility Assignment Matrix (RAM) Below is a list of the 6 (six) most common steps in developing a Responsibility Assignment Matrix (RAM). Step 1: List all project tasks and deliverables. Step 2: Identify all project stakeholders. Step 3: Determine the responsibility and accountability level for each task and ...

  13. Responsibility Assignment Matrix: the Basics and Template

    Figure 1 - The Responsibility Assignment Matrix (RAM) / RACI Matrix. To do this well and accurately, the matrix can be completed using the following steps: Step 1: Identify all the participants and (facilities) supporters of the project. Step 2: Identify all the deliverables for the project. Step 3: Discuss with all team members how they can ...

  14. What is a Responsibility Assignment Matrix

    Credit: track5/Getty Images. A Responsibility Assignment Matrix (RAM), sometimes known as a RACI chart, is a tool used in project management to keep track of all responsibilities assigned to cross-functional teams on a specific task or assignment. It's known as a RACI chart because its acronym names the four key roles displayed in the matrix:

  15. The RACI matrix: Your blueprint for project success

    RASCI is another type of responsibility assignment matrix used in project management. It retains the four core roles of RACI — Responsible, Accountable, Consulted, and Informed — but adds a ...

  16. What Is a Responsibility Assignment Matrix (RAM)?

    Introduction to Responsibility Assignment Matrix (RAM) Project management is a complex process that involves multiple stakeholders, tasks, and resources. To ensure the success of a project, it is crucial to assign clear roles and responsibilities to team members and accurately define their tasks. One tool that can help project managers achieve ...

  17. The Responsibility Assignment Matrix (RAM)

    This type of situation is repeated daily in organizations across the globe. And most of the time, there's no incompetence or bad intentions involved. ... Developing a Responsibility Assignment Matrix. One tool that project managers use to keep these assignments clear is the Responsibility Assignment Matrix (also called the RAM, or the ...

  18. Creating a RACI matrix: define your team's roles and responsibilities

    A RACI matrix, or RACI chart, is a type of responsibility assignment matrix that's about making responsibilities clear. In simple terms, it's a diagram that lists the tasks that make up a project and who is responsible for each task. RACI stands for the four different levels of involvement someone may have in a task, Responsible ...

  19. The Responsibility Assignment Matrix

    The responsibility assignment matrix, also known as RAM, is a helpful tool used in project management to identify and clarify the roles and responsibilities of each team member. It ensures that every team member understands their duties and how they fit into the project plan. Using RAM in project management helps define roles and ...

  20. Responsibility Assignment Matrix

    A Responsibility Matrix is different from a Project Plan. The Project Plan is a detailed document, while the Responsibility Matrix is a simple visual diagram. The Project Plan contains details for ...

  21. PMP Exam Tip: The Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM), also known as RACI matrix or Linear Responsibility Chart (LRC), describes the participation by various roles in completing tasks or deliverables for a project or business process. ... The RACI is just one type of RAM; the project manager can select other options such as "lead" and "resource" designation ...

  22. The Responsibility Assignment Matrix (RAM)

    A Responsibility Assignment Matrix (RAM), also known as RACI matrix or Linear Responsibility Chart (LRC), describes the participation by various roles in completing tasks or deliverables for a project or business process. ... There is typically one role with a participation type of Responsible, although others can be delegated to assist in the ...

  23. Responsibility Assignment Matrix: Template, Example & Benefits

    The goal of the Responsibility Assignment Matrix (RAM) is to clearly define roles and responsibilities of everyone on a project team. This ensures that everyone understands their role and how it fits into the bigger picture. RAM also allows for quick identification of whom to contact when an issue arises.